欢迎来到天天文库
浏览记录
ID:55917890
大小:601.32 KB
页数:7页
时间:2020-06-14
《福斯机械密封安装说明.doc》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库。
1、FlowserveInstallationInstructionsDurametallic?LS-300SeriesMultiplelipsealcartridgeforhighviscositypumps1EquipmentCheck1.1Followplantsafetyregulationspriortoequipmentdisassembly:•lockoutmotorandvalves.•weardesignatedpersonalsafetyequipment.•relieveanypressureinsystem.•consultplantMSDSfil
2、esforhazardousmaterialregulations.1.2Disassembleequipmenttoallowaccesstosealinstallationarea.1.3Removeallburrsandsharpedgesfromtheshaftorsleeveincludingsharpedgesofkeywaysandthreads.Replacewornshaftorsleeve.Makesurethesealhousingboreandfacearecleanandfreeofburrs.1.4Checkrequirementsfors
3、haft,sleeveandsealhousing,seeFigure1.SealChamberRequirementsFigure11.5Checkassemblydrawingincludedwiththesealforspecificsealdesign,materialsofconstruction,dimensions,andpipingconnections.1.6CheckshaftorsleeveOD,boxbore,boxdepth,anddistancetothefirstobstructiontoensurethattheyaredimensio
4、nallythesameasshownonthesealassemblydrawing.1.7Checkglandpilotandboltholestoensuretheyareadaptabletotheequipmentandarethesameasshownontheassemblydrawing.ManycartridgeFlowservesealdesignsincludecenteringtabs,eccentricwashers,orcenteringplatesthatdonotrequireaglandpilot.1.8Handleallsealpa
5、rtswithcare,theyaremanufacturedtoprecisetolerances.2CartridgeFlowserveSealInstallation2.1Lubricatetheshaftorsleevelightlywithsiliconelubricantprovidedwiththesealbeforeinstallinganysealparts.2.2InstallthecompletecartridgeFlowservesealassemblyontheshaftandposition.itclosetothebearinghousi
6、ngwiththesealorientatedtowardthepump.
此文档下载收益归作者所有