1、桥梁建设2014年第44卷第2期(总第225期)BridgeConstruction,Vo1.44,No.2,2014(TotallyNo.225)73文章编号:1003—4722(2014)02—0073—05福平铁路闽江特大桥主桥设计刘清江(中铁第四勘察设计院集团有限公司,湖北武汉430063)摘要:福平铁路闽江特大桥主桥采用(110+198+110)m预应力混凝土连续刚构桥,主梁采用C6O混凝土单箱单室变截面箱梁,三向预应力体系,为适应主梁产生的徐变变形,在箱梁内预留体外预应力钢束张拉条件;主墩采用双薄壁墩与主梁固结,基础采用16根2.8m钻孔灌注桩;主
2、梁采用悬臂浇筑法施工,合龙顺序为先边跨后中跨。采用BSAS4.32软件对主桥进行结构静力计算,并对3种车型通过桥梁时的车桥耦合动力响应进行计算。计算结果表明:该桥在施工及运营阶段的刚度、强度均满足规范要求,桥梁具有良好的动力特性及列车走行性,列车通过桥梁时的安全性和乘坐舒适性均满足要求。关键词:铁路桥;连续刚构;静力分析;动力响应;桥梁设计中图分类号:U448.23;U442.5文献标志码:ADesignofMainBridgeofMinjiangRiverBridgeonFuzhou—PingtanRailwayLIUQing-jiang(ChinaRail
3、waySiyuanSurveyandDesignGroupCo.,Ltd.,Wuhan430063,China)Abstract:ThemainbridgeoftheMinjiangRiverBridgeonFuzhou—PingtanRailwayisapres—tressedconcretecontinuousrigid—framebridgewithspanarrangement(110+198+110)m.ThemaingirderofthebridgeistheC60concretesingle—cellsingle—boxgirderwithvar
4、iablesectionandisprovidedwiththree—wayprestressingsystem.ToaccommodatetothecreepdeformationtoOC—curinthemaingirder,thenecessaryconditionsfortensioningtheexternalprestressingstrandshaveheenpreservedinthegirder.Themainpiersarethedoublethin—walledpiersthatarerigidlyfixedwiththemaingird
5、er.Afoundationsupportingthepierhas16nos.of2.8mboredpiles.Themaingirderisconstructedbythecantilevercastingmethodandtheclosuresequenceofthegirderproceedsfromthesidespansfirstandthecentralspanlate.ThesoftwareBSAS4.32isusedtocalculatethestructuralstaticforceofthemainbridgeandalsothevehi
6、cle—bridgecouplingdynamicresponseswhenthreetypesofthevehiclespassthroughthebridge.Theresultsofthecalculationshowthattherigidityandstrengthofthebridgeatboththeconstructionandoperationstagescanmeettherelevantrequirementsinthecodes.Thebridgehasgooddynamicandtraintravailingperformancean
7、dthesafetyandridingcomfortofthetrainspassingthroughthebridgecanmeettherequirementsaswel1.Keywords:railwaybridge;continuousrigid—frame;staticanalysis;dynamicresponse;bridgedesign1工程概况于既有福厦铁路闽江特大桥上游40m,该段河道为福平铁路闽江特大桥在福州城区跨越闽江,位感潮、通航河段,线路中心与福厦铁路平行,与航道收稿日期:2013—10—25作者简介:刘清江,高级工程师,E—mai