陈四楼老道口整改方案

陈四楼老道口整改方案

ID:11606485

大小:1.07 MB

页数:9页

时间:2018-07-12

陈四楼老道口整改方案_第1页
陈四楼老道口整改方案_第2页
陈四楼老道口整改方案_第3页
陈四楼老道口整改方案_第4页
陈四楼老道口整改方案_第5页
资源描述:

《陈四楼老道口整改方案》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库

1、陈四楼老道口改造施工组织设计永煤公司铁路运输处9目录1工程概况···················································································32工程施工组织·········································································32.1组织机构··············································································32.2劳力组织·

2、··············································································32.3时间安排···············································································32.4施工流程···············································································33施工防护措施……····························

3、·······································549施工所需机具、材料·······························································64.1施工所需机械、工器具························································64.2施工所需材料······································································75工程概算····················

4、·······························································7陈四楼老道口改造施工组织1工程概况陈四楼站老道口是原来陈四楼地销公路道口,由于陈四楼站场改造完毕,该道口取消。9根据工作安排,现需要把原道口路面进行破除,并把木枕更换成混凝土枕,为以后的线路维修带来方便。此工程由工务段负责组织施工。2工程施工组织2.1组织机构任洪俊负责施工全面管理与协调工作,为施工总负责人;徐强负责现场技术指导;李庄工区工长杜国昌(手机号为13462955811)负责现场劳力组织及施工作业;副工长颜挺铁负责安全防护。2.2劳力组织

5、:施工人员由李庄工区人员组成。2.3时间安排2.3.1计划工期:4天2.3.2所有施工人员和租用机械与施工当日上午7点准时到现场,做好施工准备。施工当日,请电务段安排有关人员配合施工(有光缆)。2.4施工流程2.4.1施工前准备工作:序号工作内容任务完成截止时间责任单位任务要求1联系风镐,挖掘机施工前2天供应科2用平板车装道碴施工前1天工务段放在老道口西侧1、2道之间3用平板车装轨枕施工前1天工务段放在老道口两侧1、2道2、3道之间92.4.2老道口改造流程如下表:序号工作内容任务完成时间(分)责任单位任务要求1确定光缆埋设位置,开始作业封锁时间为7:30-8:509:10

6、-2:403:30-4:50工务段电务段在车站封锁登记要点,做好安全防护2用风镐破除老道口路面,然后用挖掘机开挖一天工务段开挖标准为轨枕下300mm,并把破损混凝土碎料用三轮车拉出矿外3清筛道床、更换混凝土轨枕二天工务段宜采用分段倒筛法,同时更换混凝土轨枕,清筛1根更换1根,两人为1组,每组间隔至少4根轨枕。方法是先在轨枕头外开1个豁口进行扒筛,将清碴倒在后面路肩上,接着扒筛第2个轨枕空,把清碴回填到第1个轨枕空内,依次前进,循序倒筛;道心筛至枕底下50~9100mm,轨枕头筛至轨枕底下150~200mm,清筛后道床断面应符合规定标准,道碴不足及时补充4老道口两侧补充道碴、

7、顺道(起道、捣固、拨道)一天工务段用捣固机,达到线路保养维修标准3施工防护措施为确保陈四楼老道口改造施工安全,特制定如下安全防护措施:3.1在站内登记要点封锁后方可施工。3.2施工前召开全体施工人员安全现场会,进行安全措施贯彻和教育,安排具体施工内容,明确责任分工,传达安全注意事项。3.3施工现场,李庄工区工长杜国昌为现场负责人(手机号为13462955811),并负责与车站联系施工相关事宜;同时负责组织现场作业人员按章施工。3.4在抬轨枕作业时,要达到用劲均匀,动作一致,确保安全。3.5施工过程中,所有施工人员要

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。