欢迎来到天天文库
浏览记录
ID:33757759
大小:312.50 KB
页数:23页
时间:2019-02-28
《高压氢气管道施工方案》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库。
1、二化到炼油厂增设5.0Mpa氢气专线胜利炼油厂二化到炼油厂增设5.0MPa氢气专线(新区系统管线)管道安装施工方案编制单位(章):编制日期:编制人:审核人:批准人:二化到炼油厂增设5.0Mpa氢气专线工艺管道安装(施工方案)审批表NO:车间审核意见工程管理部审核意见施工人员审核意见:质检人员审核意见:预算人员审核意见:相关部室审核意见工程管理部分管领导审批主管领导批准二化到炼油厂增设5.0Mpa氢气专线目录一、工程概况··················································
2、·1二、编制依据···················································1三、施工程序···················································2四、管道组成件验收············································3五、管道预制加工···············································3六、管道焊接···························
3、····················5七、焊接质量检验···············································7八、管道安装···············································7九、管道系统试压··············································9二化到炼油厂增设5.0Mpa氢气专线一、管道系统吹洗··············································10二
4、、管道防腐绝热···············································11三、质量保证措施···············································11四、劳动力组织················································13五、施工机具计划···············································14六、施工技措用料··························
5、·····················15七、HSE管理··················································16八、工作危害分析表·············································17附、焊接工艺卡··············································18二化到炼油厂增设5.0Mpa氢气专线二化到炼油厂增设5.0Mpa氢气专线1.基本概况1.1本项目为从齐鲁分公司第二化肥厂至胜利炼油厂新敷
6、设一条5.0MPa氢气管线,进入重油加氢装置、一加氢装置、SZorb装置。氢气管线操作压力:5.0~5.07MPa,温度:常温。并增加部分管墩以及过路桁架。最大管线规格Φ273×15,管线总米数3900米,阀门18只。1.2管道敷设说明1.2.1管道走向高压氢气管线DN250自第二化肥厂外供氢气高压控制阀前经二化院内的F点至E点,向西经C点经罐区间的管带直到管带B点。管线出二化围墙后过乙烯路至炼厂围墙,在三加氢装置附近新建管带。管线经三加氢南管带走重油加氢西侧管带,去重油装置DN200氢气支线从装置北管带进装置。氢气
7、主管线经乙烯原料罐区北主管带后走北区中心路旁管带至一加氢装置1.3施工内容情况序号名称工程内容备注1管子Φ273×15,2000米。Φ219×13,1650米2管件84个3.阀门18个4.T型管架60榀5.跨路桁架4组6.增设门式支架60个1.4工程特点1.4.1管线较长,沿途经过装置多,协调困难,且装置复杂,安全隐患多。1.4.2施工现场比较特殊,尤其是大部分管道需二次倒运至现场安装,降低了工效。1.4.3部分地段无法近距离接电施工,只能采用工程车发电来满足施工要求管,进一步降低了工效。1.4.4部分地点吊装困难。
8、吊车无站位空间,局部管道的安装需用到大型吊装机具,施工成本大大增加。1.4.5需要跨过乙烯路,道路车辆过往频繁,影响施工。1.4.6由于在原有管廊安装新管架、管线,在安装时,容易出现和图纸不符现象,易造成工程量的局部变更。2.编制依据2.1山东三维石化工程有限公司提供的相关设计图纸,设计技术文件等。20二化到炼油厂增设5.0Mpa氢气专线2.2
此文档下载收益归作者所有