《武汉杨泗港长江大桥2号墩钢沉井施工关键技术.pdf》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库。
1、桥梁建设2017年第47卷第6期(总第247期)106BridgeConstruction,Vol.47,No.6,2017(TotallyNo.247)文章编号:1003-4722(2017)06-0106-05武汉杨泗港长江大桥2号墩钢沉井施工关键技术12郑大超,朱斌(1.中铁大桥局武汉杨泗港长江大桥总承包项目经理部,湖北武汉430050;2.武汉市城市建设投资开发集团有限公司,湖北武汉430050)摘要:武汉杨泗港长江大桥主桥为主跨1700m的双层钢桁梁悬索桥,该桥2号墩采用沉井基础,沉井高50m,其中上部22m为钢筋混凝土结构,下部28m为钢壳混凝土结构(分为2节
2、,高度分别为23m和5m,总重约4850t)。23m高的底节钢沉井在工厂加工后,采用气囊法下水,下水时将下河托架和助浮结构进行一体化设计,利用气囊调整钢沉井角度,以实现钢沉井主动转向;采取在钢沉井底部设置纵、横梁及底托板,封闭12个井孔的助浮措施,以减小沉井浮运吃水深度。底节钢沉井采用以顶推为主、帮拖为辅的方式浮运至墩位处抛锚,采用无导向船重锚定位系统定位;定位后接高余下5m高的钢沉井,接高后注水下沉钢沉井,并浇筑钢壳混凝土,将钢沉井下沉至设计高程,完成钢沉井施工。关键词:悬索桥;沉井基础;气囊法下水;助浮措施;定位;接高;施工技术;桥梁施工中图分类号:U448.25;U
3、445.557文献标志码:AKeyTechniquesforConstructionofSteelOpenCaissonofPierNo.2ofYangsigangChangjiangRiverBridgeinWuhan12ZHENGDachao,ZHUBin-(1.DivisionofGeneralContractProjectofYangsigangChangjiangRiverBridgeinWuhan,ChinaRailwayMajorBridgeEngineeringGroupCo.,Ltd.,Wuhan430050,China;2.WuhanUrbanCons
4、tructionInvestmentandDevelopmentGroupCo.,Ltd.,Wuhan430050,China)Abstract:ThemainbridgeoftheYangsigangChangjiangRiverBridgeinWuhanisadouble-decksteeltrussgirdersuspensionbridgewiththemainspanof1700m.ThefoundationforthePierNo.2ofthebridgeistheopencaissonfoundation.Theheightofthecaissonis50m
5、,ofwhichthe22moftheupperpartofthecaissonisthereinforcedconcretestructurewhilethe28mofthelowerpartisthesteelshellconcretestructure(dividedintothe2tierswiththeirheightrespective-lybeing23m,5mandtotalweightbeingabout4850t).Afterthefirsttiersteelopencaissonofthe23mwaswellmanufacturedinthework
6、shop,itwaslaunchedtotheriver,usingtheairbagmethod.Forthelaunchingofthecaisson,thesupportbracketsandfloating-aidstructurewerede-signedintegrally.Theanglesofthecaissonwereadjusted,usingtheairbags,sothatthecaissoncouldsteeractively.Thefloating-aidmeasures,suchasthesettingofthelongitudinaland
7、trans-versebeamsandthesupportboardsatthebottomofthecaissonandtheclosingofthe12wellholesinthecaisson,weretakensothatthedraughtofthecaissoncouldbereducedduringthefloating.Thecaissonwasfloatedtothepiersiteandwasanchoredtherebywayofpushingmainlyandtuggingasanaid.Thecais