桥梁施工计划英文版Bridge Foundation and subStructure Construction Progr

桥梁施工计划英文版Bridge Foundation and subStructure Construction Progr

ID:38801541

大小:288.00 KB

页数:14页

时间:2019-06-19

桥梁施工计划英文版Bridge Foundation and subStructure Construction Progr_第1页
桥梁施工计划英文版Bridge Foundation and subStructure Construction Progr_第2页
桥梁施工计划英文版Bridge Foundation and subStructure Construction Progr_第3页
桥梁施工计划英文版Bridge Foundation and subStructure Construction Progr_第4页
桥梁施工计划英文版Bridge Foundation and subStructure Construction Progr_第5页
资源描述:

《桥梁施工计划英文版Bridge Foundation and subStructure Construction Progr》由会员上传分享,免费在线阅读,更多相关内容在教育资源-天天文库

1、BridgeFoundationandSubstructureConstructionProgramme(k5+0003×25m=75mMamboleoBridge)1.Basis(1)TheStandardSpecificationforKenyaRoadandBridgeConstruction.(2)ContractoftheRehabilitationofKisumu-KakamegaRoad,SpecialSpecification.(3)Drawings.(4)TheGeneralRequirementofConstructionPeriod.(5)Actualcon

2、ditionin-site.2.GeneralStatusoftheBridgeweplantocommenceconstructionofKm5+000bridgerecently.Thesuperstructureis3×2.5mcast-in-situcontinuous“T”girder(30/20concrete).Thebridgepierandabutmentofsubstructureisextendedopencutfoundation(30/20concrete).Pierbodyadoptsthin-walledpier(30/20concrete)andb

3、ridgecapbeam(30/20concrete).Thetypeofabutmentbodyuseswing-wallabutment(30/20concrete)and30/20reinforcedconcretestructure.AttachedpleasefindKm5+000Manboleobridgesubstructureprogramme.3.Foundation(ExtendedOpenCutFoundation)ConstructionTechnologyScheme(1)PreparationThepreparationofconstructionme

4、chanicalequipment,staffs,locationset-out,originalmaterialtestandstandardratiotesthavebeencompleted,andthesideroadaroundconstructionlocationcouldmeetbridgeconstructionrequirement.(2)FoundationPitExcavationMechanicalequipmentshallapplytofoundationpitexcavation,andlaborforcesclearthebottomofpit.

5、Basedontheactualconditionofexcavatedculvert,foundationpitslopesetsoutis1:0.33or1:0.25.10cm-20cmwidthshallbereservedforlaborforcecleaning.Iftheundergroundwaterinhighlevel,aringdrainwillbeexcavatedaroundfoundationpit.Thetopwidthofdrainis0.5m,andunderpartis0.3m;Onewatercollectionpit(0.5*0.5*0.8m

6、3)shallbeexcavatedifnecessary.(3)SetOutandBlindingConcreteAfterfinishingfoundationpitcleaning,thesurfaceofpitshallbecompacted.Then,commencingsetoutbaselocation,dimensionsandelevation,theresultsofwhichshallbereportedtoEngineerforinspectionandapproval.Afterthat,casting100mmblindingconcrete(15/4

7、0)in-situ.Thetopelevationofblindingconcreteisthesamewiththebottomelevationofpilecap,whichisundertherequirementofspecification.Thewidthofblindingconcreteis0.05mlargerthanpiercapoutline,whichneedstrictlycontrolduringconstruction.(4)ReinforcingB

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。