1、6306运输巷施工上向顺层钻孔安全技术措施根据矿井抽采部署要求,在6306运输巷施工上向顺层钻孔,为保证6306运输巷施工上向顺层钻孔时的安全,特编制此安全技术措施,相关部门必须遵照本措施执行,(注:本措施只针对6306运输巷碛头顺层长孔抽放期间施工上向顺层钻孔,6306运输巷贯通后施工上向顺层钻孔安全技术措施另行编制。)一、钻孔施工工艺及要求(一)钻孔施工工艺采用ZYG-750C型钻机、φ75mm钻头、刻槽钻杆加中风压排粉施工顺层钻孔。(二)钻孔布置6306运输巷全长约411m,钻孔从-60mS2以南4m开始布置1号孔,钻孔间距2.4m,设计深度100m,共设计1

2、70个钻孔,钻孔沿煤层真倾斜向上施工。(附件1:6306运输巷施工上向顺层钻孔布置图)(三)施工要求1.运输巷上向顺层孔施工前,打钻队首先对现场需施工的钻孔由北向南依次进行编号并挂牌,施钻时,按钻孔编号由南向北依次施工;打钻队施工时严格按放线法施工。2.钻孔施工过程中,只准1台钻机施工,施钻地点人员不得超过3人。3.钻孔施工前,由机电区提前形成抽放管路,每竣工一个钻孔Pileboredpilecanbeused,andartificialdiggingpile,prefabricatedreinforcedconcretesheetpilesorsheetpile,

3、andsoon.Whenexcavationdepthislarge,youcansetmultichannelsupport,toreducestress,rushdrillingthroughrock,theoldbase.InretainingpilewaterjetGroutingcurtainbetweeneffects,butbecauseofthedepthofexcavationwithinthegreatwallcouldnotanchororsupport,boltcannotconstruction,bolt,NorthandSouthwoul

4、dnotbesymmetricalonbothsidesusepiles,insettingupasupportwithouttheappropriatesupportmethods.2.1.4channelsteelsheetpilewhichisasimplesteelsheetpileretainingwallprosandconsbychannelsteelbucklelaporside-by-sidecomponents.Channel6~10mlong,modeldeterminedbycalculation.Features:steelwithgood

5、durability,pitconstructionchannelcanbepulledoutafterthecompletionofbackfillsoilrecyclingtouseagain;Convenient,short;Impervioustowaterandsmallparticlesinthesoil,inareaswithhighwaterorrain-proofmeasuresareneeded;Bendingstrengthisweak,andmoreforthedepthofshallowFoundationpitislessthan4m,o

6、rGroove,supportorpulledtogethershouldbeinstalledatthetopanchor;Supportingstiffnessofsmalldeformationafterexcavation.2.1.5boredpileretainingwallonboredpileistheup-pilehasbeenwidelyusedinChina.Itsmorefortheexcavationofthepit7~10m,ingoodsoilintheNorthareaofChinahas8~9marmpileretainingwall

7、.Drillingperfusionpilesupportnursingwallbodyoffeatureshas:constructionShinovibration,andnonoise,environmentpollution-,nosqueezesoilphenomenon,onaroundenvironmenteffectsmall;wallbodystrengthhigh,stiffnessbig,supportnursingstabilitygood,9由打钻队进行及时封孔接抽。4.施工该碛头上向顺层钻孔滞后碛头距离不小于20m。5.施工时,打钻队

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。