冲击钻孔桩基施工方案(改后)

冲击钻孔桩基施工方案(改后)

ID:12998515

大小:250.00 KB

页数:51页

时间:2018-07-20

冲击钻孔桩基施工方案(改后)_第1页
冲击钻孔桩基施工方案(改后)_第2页
冲击钻孔桩基施工方案(改后)_第3页
冲击钻孔桩基施工方案(改后)_第4页
冲击钻孔桩基施工方案(改后)_第5页
资源描述:

《冲击钻孔桩基施工方案(改后)》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库

1、一、综合说明1、工程名称:瑞安市人民医院瑞祥分院行政后勤楼2、工程地点:瑞安市瑞祥新区3、建设单位:瑞安市人民医院4、设计单位:浙江现代建筑设计院5、监理单位:浙江江南工程管理股份有限公司6、勘测单位:温州工程勘察院7、总包单位:浙江新邦建设有限公司8、工程概况:桩基:桩径φ650B的60根、φ650的58根、φ750的14根;围护桩232只,新增桩46只总桩数410只,总方量;1600m3。桩长根据地质表确定,平均为12m左右。9、本工程主要技术参数本工程设计终孔要求12m桩长,12m桩长进入持力层深度1m。桩为该桩的实际长,控制孔底沉渣应在5cm内,砼充盈系数1.15-1.5,第一

2、次清孔慢速灌入清水,泥浆比重控制在1.28-1.3;二次清孔灌料前的泥浆比重严格控制在1.18-1.25终孔灌料。砼强度C25,6根桩静压,100%动测。单桩承载力分别为:φ650B的承载力为250KN、φ650的承载力为1050KN、φ750的承载力为1350KN;主筋保护层厚度50mm。按现行有关规范及规程进行施工。constructionworkareaintheformofconferencereviews.(2)reviewprogramreviewdateisdeterminedbytheprojectmanager;Accordingtotheprojectmanager

3、ofprojectqualitycontrolDepartmentrequirespreparationofamanagementplan,representativeofthemanagementauditoftheproject,approvedbytheprojectmanager;ReviewProjectOfficeissuednoticesofmeetings;Projectmanagerfacilitatesthereviewmeeting,scheduledcontentunderreview;QualitycontrolDepartmentisresponsiblef

4、ortherecords,thepreparationofthereviewreportandcorrectiveactionplan,representativeofthemanagementauditoftheproject,approvedbytheprojectmanager;QualitycontrolDepartmentisresponsibleforthepreparationofrecordsandreportsthedistributionlist,orpublishtotheInternetbyengineeringpartoftheprojectstaffandd

5、epartments.OrganizedbythequalitycontrolDepartmentisresponsiblefortrackingtheimplementationofcorrectivemeasuresinspections.3.4.5theoutputfromthemanagementreviewshallincludethefollowingelements:theeffectivenessandsuitabilityofthequalitymanagementsystem,whetheritbemaintainedandrevised;Qualitypolicy

6、andqualityobjectivesareachievedandtomeetcustomerrequirements,whetheritbemaintainedandrevised;Theallocationofresourcestomeetrequirements,whetheryouneedtoaddoradjust.3.4.6correctiveactiontrackingandverificationontheissuesraisedinthereview,bytheprimaryresponsibilityofdepartmentsdrawupcorrespondings

7、pecificcorrective,preventiveandcorrectivemeasures,andseriouslyimplemented.ProjectqualitycontrolDepartmentisresponsibleforthetracking,verificationandevaluationtheeffectofcorrectiveandpreventiveactions.3.4....(1)thesafetyprogr

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。