1、天鸿君邑物业接管验收方案天鸿君邑(一期)物业接管验收方案前言:新建房屋的接管验收,是在竣工验收合格的基础上,以主体结构安全和满足使用功能为主要内容的再检验。为保证天鸿君邑业主的顺利入住,特制定天鸿君邑物业接管验收方案。天鸿君邑(一期)接管验收流程:收楼两个月前物业进楼掌握情况确定验收日期地产、总包、施工单位、监理和物业组成联合验收小组实物验收资料移交设备验收组房屋验收组产权资料技术资料政府验收合格证水电气供应合同逐套设备查验并记录进入室内逐户逐间查验并记录统计汇总后反馈至地产工程部统计汇总后反馈至地产工程部整改后进行复验整改后进行复验记录后四方签字确认记录后四方签

2、字确认贴验讫封条钥匙交接betheorderofinstallation.(3)thepipelineinstallation,thehoseshouldbechecked,mirrorandlenspadoutofthemetalsealoflight,withoutanyscratches,pits,rust.Lowpressurepipeflangesealingandgasketshallnotaffectsealperformancedefectssuchasscratches,spots.(4)high-strengthboltsshouldbecle

3、aned,Visualinspectionnodefects,andcoatedwithmolybdenumdisulfidetoprotect.(5)highpressureflangeandpipeendsthreadedconnections,pipe-threadchamfershouldbeexposed,padofthelens.(6)shouldbeaccuratelyintotheflangesealingsurfaces,apairofflangeconnectionsshouldbekeptparalleltoeachother,thedevi

4、ationshallnotbegreaterthantheflangeouterdiameterof1.5%andlessthan2mm,notusestrongerboltsdeskewingmethod.(7)theflangeconnectionshouldbemaintainedandpipesconcentric,andshouldensurethattheboltsfreetoputthemin.(8)thehighvoltageendthreadsofthepipeshouldbecleaned,thesurfaceshallnotbedefecti

5、ve.(9)flangeconnectionsboltsshouldusethesamespecifications,installationshouldbeconsistent,whenfasteningboltssymmetricallyeven.Elasticmoderate,afterfasteningboltsandnutsshouldbeflush.High-temperaturepipinghottighttheboltsshouldalso,tighthotworkingtemperatureshouldbemaintainedafter2hour

6、s.(10)pipelineinstallationallowsdeviationmeetfollowingprovides:projectallowsdeviationcoordinatesoverheadandthetrenchindoor15OutdoorIndoor25elevationoverheadandthetrenchoutdoor±152L‰maximum50±20levelpipelinestraightdegreesDN≤1003L‰maximum80DN﹥1003L‰maximum80Statetubeleadverticaldegrees

7、5L‰maximum30intorowpipelinespacing1520(11)pipelineconnectionShi,shallnotstrongcounterpart,addedpartialpadoraddedmultilayerpadofMethodtoeliminatetheinterfaceportspace,skewed,notoneaftertheHi-Loandotherdefects.第23页共19页天鸿君邑物业接管验收方案一、成立验收小组:负责天鸿君邑(一期)接管验收工作,小组由地产、总包、施工单位、监理、物业联合组成,具体工作职责见

8、下表。接管

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。