1、HY/2013/12TuenMun-ChepLapKokLink-NorthernConnectionTollPlaza&AssociatedWorksMethodStatement–ConstructionofFootingofFalseworkForPortalBeamConstructionContractNo:HY/2013/12ProjectTitle:TuenMun-ChekLapKokLink-NorthernConnectionTollPlaza&AssociatedWorksMethodStatement–ConstructionofFootingofFalseworkFor

2、PortalBeamConstructionDocumentNo:MSSF/M/00xxRevision:00Date:14August2015HY/2013/12TuenMun-ChepLapKokLink-NorthernConnectionTollPlaza&AssociatedWorksMethodStatement–ConstructionofFootingofFalseworkForPortalBeamConstructionMethodStatement–ConstructionofFootingofFalseworkForPortalBeamConstructionDocume

3、ntNo:MSSF/M/00xxRevision:00Date:14August2015RevisionHistoryRevisionNo.DescriptionRevisedByDate00FirstSubmission14August2015HY/2013/12TuenMun-ChepLapKokLink-NorthernConnectionTollPlaza&AssociatedWorksMethodStatement–ConstructionofFootingofFalseworkForPortalBeamConstructionMethodStatement–Construction

4、ofFootingofFalseworkForPortalBeamConstructionDocumentNo:MSSF/M/00xxRevision:00Date:14August2015Checkedby:PositionSignatureNameDateSiteAgentJohnWongHeadofConstructionRogerCheungConstructionManagerEricKwokPreparedby:ACMLiuHailongHY/2013/12TuenMun-ChepLapKokLink-NorthernConnectionTollPlaza&AssociatedWo

5、rksMethodStatement–ConstructionofFootingofFalseworkForPortalBeamConstructionTableofContent1.0Introduction2.0Scopeofworks3.0Sequenceandmethodsofworks4.0Plantandequipmentemployed5.0Riskconcern6.0Environmentconcern7.0Appendix8.0HY/2013/12TuenMun-ChepLapKokLink-NorthernConnectionTollPlaza&AssociatedWork

6、sMethodStatement–ConstructionofFootingofFalseworkForPortalBeamConstruction1.0IntroductionThemethodstatementdescribesthemethodologyfortheconstructionoffootingoffalseworkwhichwillbeerectedtemporarilyfortheportalbeamconstructionofTD1decking.Theconstructionsequenceandmethodstobeemployedareoutlinedinthem

7、ethodstatement.Theplantsandequipmentstobeemployedfortheworks,andrelatedsafetyandenvironmentalconcernsarealsoinvolved.2.0Scopeofworks2.1LocationThefootingstobebuiltarealongthetwosidesofeastboundLungMum

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。