欢迎来到天天文库
浏览记录
ID:7912650
大小:1.34 MB
页数:2页
时间:2018-03-02
《earth slip at excavation site外语英文电子书》由会员上传分享,免费在线阅读,更多相关内容在教育资源-天天文库。
1、EARTHSLIPATEXCAVATIONSITETypeofbuildingworkTheprojectinvolveserectionof4unitsof2-storeyterracehouseeachwithabasement.Therewasa2.3mhighearthretainingrubblewallattheboundarywiththeadjacenthouse.Anopen-cutwithaslopewasadoptedfortheexcavation,andtheslope
2、wasprotectedwithalayerof300mmthickmassconcrete.Figure1:ExcavationwascarriedoutnearthebaseofexistingrubblewallWhatwentwrongWhenthesitewascutdownby2.7m,aslipdevelopedcausingtheexistingrubbleretainingwalltorotateandtumbledown.Theboundarywalloftheadjacen
3、thouseandtheperimeterdrainwerealsodamaged.Figure2:Thefailedrubbleretainingwall08-EarthslipatexcavationsitePg.1of2Investigationsrevealedthatthecontractorhadexcavatedforpilecapsalongthewholelengthatthefootoftheslope,insteadofasmallstretchatatime.Thedes
4、ignalsodidnottakeintoaccountweakeningofthesoilduetorain.Learningpointsa)Precautionarymeasuresmustbeputinplacetopreventdeteriorationofslopeduetoweather.b)Ifthedesignnecessitatesaparticularsequenceofconstruction(suchasexcavationofpilecapinaspecificsequ
5、ence),thisshouldbeclearlyshownonthedrawings.c)Theprofessionalengineershouldvisitthesiteregularlytoconfirmthattheconstructionsequenceisinaccordancewiththedesignassumption,andthesitesupervisorshouldbevigilanttoensurethatprecautionarymeasuresareputinpla
6、ce.d)Iftheexcavationiscarriedoutnearthebaseofanexistingearthretainingstructure,acheckonpossiblereductioninpassiveresistancemustbecarriedout.e)Soilparametersshouldtakeintoaccountthemostseveresituation.f)Designmustcaterforloadingconditionduetoover-exca
7、vation.08-EarthslipatexcavationsitePg.2of2
此文档下载收益归作者所有