中铁十九局新花苗隧道施工组织设计

中铁十九局新花苗隧道施工组织设计

ID:9210028

大小:501.85 KB

页数:73页

时间:2018-04-22

中铁十九局新花苗隧道施工组织设计_第1页
中铁十九局新花苗隧道施工组织设计_第2页
中铁十九局新花苗隧道施工组织设计_第3页
中铁十九局新花苗隧道施工组织设计_第4页
中铁十九局新花苗隧道施工组织设计_第5页
资源描述:

《中铁十九局新花苗隧道施工组织设计》由会员上传分享,免费在线阅读,更多相关内容在应用文档-天天文库

1、株六复线新建铁路工程第十标段(DIIK199+573~DIIK203+407)新花苗隧道施工组织设计编制:审核:批准:铁十九局二处第一隧道公司一九九八年九月二十六日1目录第一章总体概况说明·················································································1一、编制依据···························································································

2、··1二、工程简介·····························································································1三、气候、水文地质概况·········································································2四、主要工程项目及数量·········································································2

3、五、工程竣工日期及计划工期·································································2第二章施工总体规划·················································································3一、隧道施工总体安排·············································································3二、建立施工管理的组织机构··

4、·······························································3(一)管理模式·························································································4(二)项目管理组织机构·········································································4(三)施工队伍的设置及施工任务划分··········

5、········································5(四)施工队班组设置及劳动力组织安排··············································6三、隧道施工主要机械设备·····································································7四、隧道施工进度规划···········································································

6、··8第三章临时工程及施工准备·····································································9一、施工总平面布置·················································································9二、临时工程和主要施工设施说明·························································9第四章确定施工中的重难点及拟应用的“四新”技术·

7、·······················14一、应用地质超前预测预报技术探测地质围岩状况····························14二、采用新奥法结合地质预测,实施动态设计及施工························142三、针对可能出现的大涌水,施工前考虑多种治理方案····················14四、应用微震动控制爆破技术,保证既有线安全································14五、采用全断面光爆新技术·································

8、··································14六、应用电脑钻孔台车精确钻孔·······································

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。