《武汉卓刀泉公园改造地下车库抗浮锚杆施工方案》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库。
1、武汉卓刀泉公园改造地下车库抗浮锚杆施工方案武汉卓刀泉公园改造地下车库抗浮锚杆施工方案湖北中构加固工程技术有限公司二0一四年七月九日目 录湖北中构加固工程技术有限公司 联系电话:15071282777第17页共16页 武汉卓刀泉公园改造地下车库抗浮锚杆施工方案第一章施工条件··············································一、编制依据··················································二、工程概况·················
2、·································第二章抗浮桩(锚杆)设计与基本试验·····························一、抗浮锚杆结构设计主要参数··································二、抗浮锚杆拉力设计参数······································三、抗浮锚杆基本试验···········································第三章施工组织和措施·······························
3、·········一、施工准备··················································二、施工进度安排··············································三、抗浮桩锚杆施工工艺流程、技术参数··························第四章工程施工质量保证措施··································一、质量控制措施··············································二、质量保证具
4、体内容··········································三、材料质量要求及节约措施····································第五章文明施工与安全措施湖北中构加固工程技术有限公司 联系电话:15071282777第17页共16页 武汉卓刀泉公园改造地下车库抗浮锚杆施工方案····································一、安全生产、文明施工········································二、安全保证体系
5、及措施········································三、环保文明施工保证体系及措施·······························武汉卓刀泉公园改造地下车库抗浮锚杆施工方案第一章施工条件一、编制依据:1、由湖北建艺风工程设计有限公司设计的《卓刀泉公园改造工程地下车库抗浮锚杆设计变更图纸》。2、地质勘察报告:暂无。3、《岩土锚杆锚索技术规程》(CEC22:2005)。4、政府及行业行政主管部门对建筑施工管理的有关规定。湖北中构加固工程技术有限公司 联系电话:15071282
6、777第17页共16页 武汉卓刀泉公园改造地下车库抗浮锚杆施工方案二、工程概况:武汉卓刀泉公园改造工程项目地下车库,为地下两层,抗浮锚杆设置面积区为688m2,主体结构为钢筋混凝土框架剪力墙结构。基础为独立承台基础和地下独立基础,基础板厚为400mm,基础防水板底标高为绝对标高-11.1m,底板开孔可见地下承压水涌出,水头150高。第二章抗浮桩(锚杆)设计与基本试验一、抗浮锚杆结构设计主要参数:1、抗浮锚桩(杆)总数:163根(基础平面图-锚杆平面布置图)。2、钻孔体:锚杆成孔直径≥150mm,自基础垫层绝对顶标高至锚杆锚固段为⑤-2层
7、泥岩中风化层,总长度暂定6.0米为锚杆钻孔深度。3、固结体:水泥砂浆强度不得低于30MPa,注浆用水泥浆体采用普通硅酸盐水泥,水泥材料标号不得低于P42.5,且宜采用普通硅酸盐水泥,注浆材料采用的拌和水宜采用饮用水,不得使用污水;水泥砂浆只能用于一次注浆,其细骨料应选用最大尺寸小于2.0mm的砂;水泥浆中氯化物的含量不得超过水泥重量的0.1%。4、锚杆:采用锚筋2Φ22(HRB400),点焊成束(抗拉强度设计值fy=360MPa)。5、锚杆在底板与岩层界面上下各200mm范围内涂环氧树脂减少锚杆锈蚀。二、抗浮锚杆拉力设计参数1、锚杆锚固
8、段长度及抗拔承载力特征值:锚杆进入⑤-2层泥岩中风化层的长度不小于3m。2、通过基本试验,确定能否满足设计承载力。3、验收试验:锚杆验收抽样数为3根,最大试验荷载应取锚杆杆体抗拔极限承载力特征值的2倍。三、