1、桥梁建设2017年第47卷第2期(总第243期)BridgeConstruction,Vol.47,No.2,2017(TotallyNo.243)1文章编号:1003-4722(2017)02-0001-06平潭海峡公铁两用大桥总体施工方案马晓东(中铁大桥局集团有限公司,湖北武汉430050)摘要:平潭海峡公铁两用大桥的FPZQ‐3标段全长约11.15km,包括3座通航孔桥(双塔钢桁混合梁斜拉桥)、119孔非通航孔桥(混凝土梁桥)、34孔引桥(简支钢桁结合梁桥)。针对桥位处施工条件恶劣、工程量巨大、作业时间短等特点,基础施工采用长栈桥、先平台后围堰的方
2、案,其中栈桥全长约7.5km,通航孔桥采用打入桩、导管架及“打入桩+锚桩”3种钻孔平台方案,采用5000型旋转钻机施工大直径钻孔桩基础(直径为4.0m和4.5m),桥塔墩承台采用防撞吊箱围堰施工;通航孔桥桥塔均采用爬模施工,且爬模作业平台采用包围结构;通航孔桥采用浮吊及架梁吊机双悬臂法进行大节段钢桁梁施工;非通航孔桥的简支钢桁梁采用工厂整孔制造、浮吊整孔架设的施工方案;混凝土箱梁采用移动模架法施工。关键词:跨海桥;公路铁路两用桥;斜拉桥;结合梁;钢桁梁;超大直径钻孔桩;吊箱围堰;大节段架设法;施工方案中图分类号:U448.121;U445.4文献标志码:
3、AGeneralConstructionSchemeofPingtanStraitsRail‐cum‐RoadBridgeMAXiaodong‐(ChinaRailwayMajorBridgeEngineeringGroupCo.,Ltd.,Wuhan430050,China)Abstract:TheContractFPZQ‐3ofthePingtanStraitsRail‐cum‐RoadBridgeistotallyabout11.15kmlongandcontains3navigablespanbridges(double‐pylonsteeltr
4、usshybridgirdercable‐stayedbridges),119spansofthenon‐navigablespanbridges(concretegirderbridges)anda34‐spanapproachbridge(simply‐supportedsteeltrusscompositegirderbridge).Inthelightofthecharacteristicsthattheconstructionconditionsatthebridgesitearetough,theengineeringquanti‐tiesa
5、reenormousandtheconstructiontimeislimited,thefoundationsoftheContractaretobeconstructed,mainlyusingtheschemeofthelongtrestleandofbuildingtheboringplatformsfirstandthecofferdamslate,ofwhichthetrestleistotallyabout7.5kmlong.Fortheconstructionofthefoundationsofthenavigablespanbridge
6、s,3typesoftheboringplatformstoberespectivelysupportedonthedrivenpiles,jacketsupportsandonthe“drivenpiles+anchorpiles”arearrangedandthelargediameterboredpiles(diameters4.0mand4.5m)ofthefoundationsareconstruc‐ted,usingtheType5000rotaryboringmachines.Thepilecapsofthepylonpiersarecon
7、structed,usingtheanti‐collisionsteelboxedcofferdams,thepyloncolumnsareconstructed,allusingtheclimbformworkandtheworkingplatformsoftheclimbformworkarethesurroundingstructures.Thesteeltrussgirdersofthenavigablespanbridgesaretobeerectedintwo‐sidecantileversandinlargesegments,usingth
8、efloatingcranesanddeckcranes.Thesimply‐s