1、桥梁建设2016年第46卷第4期(总第239期)BridgeConstruction,V01.46,No.4,2016(TotallyNo.239)文章编号:1003—4722(2016)04—0001一05平潭海峡公铁两用大桥Z03号墩导管架施工关键技术徐启利,王东辉(中铁大桥局集团有限公司,湖北武汉430050)摘要:平潭海峡公铁两用大桥的鼓屿门水道桥为(128+154+364+154+128)m的钢桁混合梁斜拉桥,该桥Z03号墩基础采用18根≯4.5m超大直径钻孔桩,墩位处水深45m,海床为裸露强风化花岗岩。针对墩位处复杂的水文地质条件和恶劣的海洋施工环境,Z03号墩采用导管架钻孔平台

2、方案施工。导管架总平面尺寸为114m×70m,采用52根≯1700mm×12mm套管,套管间设4层庐600mm×8mm钢管联结系。导管架套管顶高程为+2.96m,底口高程根据海床扫测结果设置;套管平面上分3组制造;采用浮吊将导管架整体吊装运输至墩位,初步定位后下放着床,利用角桩调平系统精确调平定位;导管架调平后在套管内插打直径1.5m的支承桩,并采用级配碎石填充导管架套管与支承桩间的缝隙,快速形成钻孔平台下部结构。关键词:跨海大桥;公路铁路两用桥;斜拉桥;钻孔桩基础;钻孔平台;导管架;桥梁施工中图分类号:U448.27;U445.551文献标志码:AKeyTechniquesforConst

3、ructionofJacketSupportsatPierZ03ofGuyumenWaterwayBridgeofPingtanStraitsRail--cum--RoadBridgeXUQi—li,WANGDong—hui(ChinaRailwayMajorBridgeEngineeringGroupCo.,Ltd.,Wuhan430050,China)Abstract:TheGuyumenWaterwayBridgeofthePingtanStraitsRail—cure—RoadBridgeisasteeltrusshybridgirdercable—stayedbridgewiths

4、panarrangement(128+154+364+154+128)m.ThefoundationforthepierZ03ofthebridgeistheonethatiscomprisedof18nOs.ofthe4.5msuperlargediameterboredpiles.Thewaterdepthatthepiersiteis45mandtheseabedistheuncoveredintensivelyweatheredgranite.Inthelightofthecomplexhydrologyandgeologycondi—tlonsandtheharshmarineco

5、nstructionenvironmentatthepiersite,theboredpilesofthepierwereconstructed,usingtheschemeofthejacketboringplatform.Thegeneralplandimensionsofthejacketsupportsoftheplatformare114m×70m.52nos.ofthe≠1700mmx12mmiacketswereusedforthesupportsandamongthejackets,4levelsofthetiesystemsofthe乒600mm×8mmsteelpipes

6、werearranged.Theelevationofthejackettopsis+2.96mandtheelevationofthebottomopeningsofthejacketsissetaccordingtOthescanningsurveyoftheseabed.IntheplanoftheJacketsupports,thesupportsweremanufacturedin3groupsandthesupportswereintegrallyliftedandtransportedtOthepiersitebythefloatingcrane.AtthetimetheSUp

7、portswereDrelimi—narilypositioned,thesupportswerelowereddowntOtheseabedandthesupportswerethenpre-ciselyleveledandpositioned,usingthecornerpilelevelingsystems.Afterthesupportswere1ev—eled,the庐1.5msupportpile

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。