《停工保护钢筋方案》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库。
1、........目录1、编制目的及适用范围··································································22、编制依据·············································································23、停工工程概况·······································································24、停工部署····
2、········································································34.1、停工安排···········································································34.2、停工期间主要工作内容·······························································35、停工具体工作安排及做法··············
3、·················································35.1、现场清理·········································································35.2、成品保护·········································································4(1)、钢筋··········································
4、····································4(2)、地库区域的降水····································································4(3)、后浇带部位保护···································································6(4)、F区、G区原土保护·····················································
5、·············105.3、主要材料机械设备退场······························································10(1)、周转材料·········································································10(2)、钢筋加工设备及木工设备···························································115.4、人员退场··
6、········································································116、施工组织设计········································································117、项目正常运转保障措施································································11.专业学习资料.........7.1、人员组织保障··
7、··································································117.2、进度质量保障····································································127.3、安全文明施工保障·································································121.编制目的及适用范围根据2015年10月19日甲方下发的指令单编号-
8、003,具体内容为:请贵司暂停苏州绿地中央广场3#地块3#楼办公楼的施工,具体复工日期待我司复工指令单为准。我司在收到指令单—003后根据图纸及现场时间情况分析以联系单编号-022回复,地库范围包括3#楼地下室一层、二层,3#楼暂停施工直接影响未完成地库F区、G区施工(F区、G区是3#楼出土唯一运输路线)同时也将影响地库的全面结顶