停工保护钢筋方案说明

停工保护钢筋方案说明

ID:26058001

大小:1.08 MB

页数:13页

时间:2018-11-24

停工保护钢筋方案说明_第1页
停工保护钢筋方案说明_第2页
停工保护钢筋方案说明_第3页
停工保护钢筋方案说明_第4页
停工保护钢筋方案说明_第5页
资源描述:

《停工保护钢筋方案说明》由会员上传分享,免费在线阅读,更多相关内容在工程资料-天天文库

1、WORD格式可编辑目录1、编制目的及适用范围··································································22、编制依据·············································································23、停工工程概况·······································································24

2、、停工部署············································································34.1、停工安排···········································································34.2、停工期间主要工作内容·······························································35、停工具体工作安排

3、及做法·······························································35.1、现场清理·········································································3专业知识整理分享WORD格式可编辑5.2、成品保护·········································································4(1)、钢筋

4、··············································································4(2)、地库区域的降水····································································4(3)、后浇带部位保护···································································6(4)、F区、G区原土保护···

5、·······························································105.3、主要材料机械设备退场······························································10(1)、周转材料·········································································10(2)、钢筋加工设备及木工设备·············

6、··············································115.4、人员退场··········································································11专业知识整理分享WORD格式可编辑6、施工组织设计········································································117、项目正常运转保障措施···········

7、·····················································117.1、人员组织保障····································································117.2、进度质量保障····································································127.3、安全文明施工保障···························

8、······································121.编制目的及适用范围根据2015年10月19日甲方下发的指令单编号-003,具体内容为:请贵司暂停苏州绿地中央广场3#地块3#楼办公楼的施工,具体复工日期待我司复工指令单为准。我司在收到指令单—003后根据图纸及现场时间情况分析以联系单编号-022回复,地库范围包括3#楼地下室一层、二层,3#楼暂停施工直接影响未完成地库F区、G区施工(F区、G区是3#楼出土唯

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。