1、隧道浅埋岩堆体ø108大管棚超前支护施工工艺编制:邵美华审核:张子菁宝达二级公路一合同段项目经理部二00九年十二月五日27目录1.编制依据·································12.工程概况·································22.1概述··································22.2大管棚变更情况························32.3大管棚超前支护方法····················43.施工

2、工艺·································73.1测量放样······························7273.2钻孔··································93.3配管·································113.4送管·································123.5下钢筋笼·····························133.6管口封闭··············

3、···············133.7注浆·································133.8沉降观测·····························18273.9事故预防和处理·······················183.10机具设备和劳力······················194.安全措施································205.结论····································216.相关知识

4、点······························217.主要参考书目····························241.前言南京市宝剑至达川二级公路一标段下南城隧道全长900m(K5+100~K6+000),但其进口处于破碎土岩堆地段长达182m,且最浅埋深仅2m,同时围岩含水量大,工程力学性质差,开挖后易坍塌,成洞困难。27为确保开挖稳定,进口段55m,隧道拱部120°范围采用ø108×8mm超前大管棚注浆支护辅助施工,共设两环,每环钢管总长度30m。我公司施工类似大直径的长大

5、管棚,并且达到两环以上(包括两环),这是第一次。其施工工艺和方法尚无成熟的经验可以借鉴,需要进行摸索和研究。因此有必要对ø108大管棚超前支护的施工方法、适用机械、劳动组织等进行研究和总结,以便更好地加以推广和应用。将ø108大管棚超前支护的施工工艺,形成一整套操作性强、系统完整、详实准确、技术含量高、有推广价值的成果。对于提高工程的科技含量,增强技术创新能力,全面贯彻“科技是第一生产力”,推动公司的科技进步和“科技兴企”战略的实施,都具有重大的意义。2.工程概况2.1概述宝剑至达川二级公路一标段下南城隧

6、道位于宝剑县城南郊下南城,隧道穿越下南城山,进口里程K5+100,出口里程K6+000,全长900m,路线设计纵坡-3%、-0.094%。进口30.632m及出口段192.75m分别位于半径为120m及200m的曲线上,其余地段位于直线上。进口K5+100段55m,为Ⅱ27类围岩,隧道位于坡积碎石土层上,含水量大,埋深浅,工程力学性质差,围岩开挖后易坍塌,成洞困难。于隧道拱部120°范围采用超前大管棚注浆支护辅助施工(大管棚共布置两环),边墙及仰拱采用超前小导管注浆支护辅助施工。且设2榀/m拱、墙、仰拱格

7、栅钢架加强支护。隧道开挖最大尺寸为宽×高=13.24m×9.86m。隧道衬砌内净空宽度为9+2×1.0米。限界净宽:10.5m,限界净高:5.0m。2.2大管棚变更情况原设计管棚里程段为K2+438~K2+488(50m),管棚长度60m,分两环布置。变更一:管棚里程段由K2+438~K2+488(50m)变更为K2+433~K2+488(55m),形成两个方案:①按两环布置,管棚长度为65m(里程段+一个接头+超前量=55+5+5=65m);②按三环布置,管棚长度为70m(里程段+二个接头+超前量=55

8、+5×2+5=70m)。考虑到按①施工,每环管棚长度都超过了30m,很难达到规范和质量要求。故采用②,每环长度分别定为24m、24m、22m。实际施工时,钻孔记录显示,第二环管棚已有2m伸入岩层,这样,第三环管棚已无必要,将其取消。27变更二:钢管接头原设计为管子两头车公螺纹,对接后,外套厚壁管箍,将丝扣上紧。考虑到加工螺纹,费用很高,故变更为两种接头方法:外套管和丝扣法。其中,外套管法用于第一环大管棚,丝扣法用于第二环大管棚

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。