富阳鹿山大桥主墩深水承台施工技术

富阳鹿山大桥主墩深水承台施工技术

ID:36543965

大小:314.75 KB

页数:4页

时间:2019-05-11

富阳鹿山大桥主墩深水承台施工技术_第1页
富阳鹿山大桥主墩深水承台施工技术_第2页
富阳鹿山大桥主墩深水承台施工技术_第3页
富阳鹿山大桥主墩深水承台施工技术_第4页
资源描述:

《富阳鹿山大桥主墩深水承台施工技术》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库

1、富阳鹿山大桥主墩深水承台施工技术周功建77文章编号:1003—4722(2010)04—0077—04富阳鹿山大桥主墩深水承台施工技术周功建(中铁大桥局集团第一工程有限公司,河南郑州450053)摘要:富阳鹿山大桥主桥为(118+256+118)m双塔单索面预应力混凝土斜拉桥,桥塔墩承台为圆形,直径22m,高5.5m,承台底面在设计水位以下达15m,采用圆形双壁钢套箱围堰施工方案。该围堰不设内支撑,兼有挡水和模板功能。围堰在工厂内竖向分节、环向分块制作,车运至墩位处拼装,用千斤顶整体下放首节围堰自浮于水中,再对称安装剩余单元;利用定位桩精确定位,长

2、臂挖机配合吸泥机均匀下沉围堰至设计标高。封底混凝土不设置隔仓,采用垂直导管法一次性灌注。针对大体积承台,从配合比优化、混凝土输送方式、浇筑顺序、温度监控及养护等方面采取控制措施保证了承台大体积混凝土施工质量。关键词:斜拉桥;承台;围堰;大体积混凝土;桥梁施工中图分类号:U448.27;U443.25文献标志码:AConstructionTechniquesforDeepwaterPileCapsofPylonPiersofLushanBridgeinFuyangZHOUGong-jian(The1stEngineeringCo.,Ltd.,Chin

3、aRailwayMajorBridgeEngineeringGroup,Zhengzhou450053,China)Abstract:ThemainbridgeoftheLushanBridgeinFuyangisadouble—pylonandsingle—cable—planeprestressedconcretecable—stayedbridgewithspanarrangement(118+256+118)m.Thepilecapsforthepylonpiersofthebridgearecircularinshape,22mindia

4、meter,5.5mindepth,15munderthedesignedwaterlevelfromthebottomofthecapsandwereconstructedbythecir—culardouble—wallsteelboxedcofferdams.Insideeachcofferdam,theinternalbracingswerenotprovidedandthecofferdamconcurrentlyservedasthewaterretainingstructureandformwork.Thecofferdamwasma

5、nufacturedverticallyintiersandcircularlyinsegmentsinshop,deliveredbytruckstOthepiersitewheretheywereassembledtogether.Thefirsttiercofferdamwasfirstlyintegrallyloweredtotheriverbyjacks,floatedintheriverandthenthesuccessivetiersofthecofferdamweresymmetricallyinstalled.Thecofferd

6、amwasaccuratelypositionedbythepositio—ningpilesandwasevenlysunktoitsdesignedelevationbydredgingbytheaidofthelongboomexcavator.Fortheconstructionofthebasesealingtremieconcreteofthecofferdam,theconcretewascastonetimebytremieducts,nottobedoneinpartitionbulkbypartitionbulk.Inregar

7、dofthemassiveconcreteforthepilecaps,therelevantcontrolmeasuresoftheconcretemixpropor—tioningoptimization,conveyingways,castingsequence,temperaturemonitoringandcontrolandcuringweretakenandtheconstructionqualityoftheconcretewashenceensured.Keywords:cable—stayedbridge;pilecap;cof

8、ferdam;massiveconcrete;bridgeconstruction收稿Et期:2010—05一O7作者简介

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。