1、桥梁建设2014年第44卷第1期(总第224期)BridgeConstruction。Vo1.44,No.1,2014(TotallyNo.224)101文章编号:1003—4722(2014)01—0101—06斜交连续箱梁顶推施工中落梁仿真分析蒋田勇,安磊,田仲初,徐金华(长沙理工大学土木与建筑学院,湖南长沙410114)摘要:为了解斜交连续梁桥顶推落梁施工中结构受力状态,给施工提供技术支撑,以长沙市营盘东路浏阳河大桥为例,采用在支承处节点施加强迫竖向位移的方法模拟箱梁的落梁过程,对落梁过程进行仿真分析,计算千斤顶的顶升力和混凝土箱梁的应力,与实测结果进行比较,并分析相
2、邻墩顶的梁底高差对顶升力和箱梁应力的影响。结果表明:箱梁顸、底板始终处于受压状态,且只有顸升处的梁体及其相邻粱体的应力变化相对较大;当相邻墩顶的梁底高差在25mm以内时,其顶升墩处的项升力增量在5以内,且顶升墩处箱梁截面仍处于受压状态;落梁过程中,顶升力和箱梁应力的仿真计算结果与实测结果吻合较好,说明仿真分析准确、可靠。关键词:连续梁桥;斜交桥;箱形梁;顶推法施工;仿真分析;落梁;梁底高差;应力;有限元法中图分类号:U448.21;U445.462文献标志码:ASimulationAnalysisofJacking—downofGirderinIncrementalLaun
3、chingConstructionofObliqueContinuousBoxGirderJIANGTian—yong,ANLei,TIANZhong。chu,XUJin—hua(SchoolofCivilEngineeringandArchitecture,ChangshaUniversityofScienceandTechnology,Changsha410114,China)Abstract:Tohaveanunderstandingofthestructuralforceconditionsoftheobliqueconcretecontinuousboxgirde
4、rbridgeintheconstructionofincrementallaunchingandjacking—downofthegirderandtoprovidetechnicalsupportfortheconstruction,theYingpanEastRoadLiuyangRiv—erBridgeinChangshacitywascitedasanexample,theprocessofjacking—downoftheconcreteboxgirderofthebridgewassimulatedandanalyzedbythemethodofapplyin
5、gforcedverticaldis—placementatthesupportnodalpoint,thejackingforcesofthejacksandthestressofthegirderwerecalculated,thecalculationswerecomparedtothemeasurementsandtheinfluencesofthegirderbottomheightdifferencesoftheadjacentpiertopsonthejackingforcesandthestresswereanalyzed.Theresultsofthesi
6、mulationandanalysisrevealthatthetopandbottomslabsoftheboxgirderhavebeenincompressionallthetimewiththeexceptionthatonlythestressofthegirderatthejackingpierandadjacentpierschangesrelativelygreatly.Whentheheightdiffer—encesofthegirderbottomattheadjacentpiertopsarewithin25mm,theincrementofthej
7、ack—ingforcesofthejackingpierarewithin5andthecrosssectionofthegirderatthejackingpierremainscompressive.Inthejacking—downofthegirder,thesimulationcalculationsofthejackingforcesandthestressofthegirderarewellagreeablewiththemeasurements,showingthatthesimulationan