1、学兔兔www.xuetutu.com水利水电技术第46卷2O15年第9期水电站建设中新增水土流失预测及防治措施研究菊燕宁,张壮志(1.四川电力职业技术学院,四川成都610072;2.中国长江三峡集团公司,湖北宜昌443002)摘要:为准确预测因水库水电站工程建设而导致的新增水土流失,本文以小河水电建设工程为例,在详细调查统计项目区扰动面积、弃方量、水土保持设施破坏情况基础上,对项目区新增水土流失预测方法进行了研究,预测出该工程建设产生新增水土流失1.459万t。经综合分析提出水土流失防治重点区域为主体工程施S-场地、渣场转运点和渣场区,并根据预测的水土
2、流失量和项目区的特点,分析制定项目区水土流失防治措施,在弃渣场修建130m挡渣墙,在项目其他区域有针对性地种植苜蓿及植物谷坊等适应性强的植物。结合工程实施经验,提出了工程水土保持方案实施的合理化建议。关键词:水库电站;新增水土流失;预测;防治措施doi:10.13928/j.enki.wrahe.2015.09.030中图分类号:Tv7+S157(263)文献标识码:B文章编号:1000—0860(2015)09—0128·07Forecastofnewlyincreasedsoilandwaterlossduringconstructionofhyd
3、ropowerstationandstudyonitspreventionmeasuresjuYanning,ZHANGZhuangzhi(1.SichuanElectricVocationalandTechnicalCollege,Chengdu610072,Sichuan,China;2.ChinaThreeGorgeCorporation,Yichang443002,Hubei,China)Abstract:Foraccuratelyforecastingthenewlyincreasedsoilandwaterlosscausedbytheco
4、nstructionofreservoirandhydropow—erstation,XiaoheHydropowerStationConstructionProjectistakenasthestudycaseforstudythemethodofforecastingthenewlyincreasedsoilandwaterlOSSwithintheprojectareaonthebasisofthedetailedinvestigationandstatisticofthedisturbedarea,a—mountofdisusedsoiland
5、thedamageofsoilandwaterconservationfacilities.Itisforecastedthatthenewlyincreasedsoilandwaterlossistobe14590.00tfromtheconstructionofthisproject.Throughacomprehensiveanalysis,itisproposedthatthekeyregionsforpreventingthesoilandwaterlossaretobetheconstructionsiteofthemainstructur
6、e,spoildisposaltransferareaandthespoildisposalyard,andthenthemeasuresforpreventingthesoilandwaterlosswithintheprojectareaareanalyzedandmade,i.e.constructingthespoilretainingwallwiththelengthof130mforthespoildisposalyardandplantingthoseplantswithstrongadaptabilitytothelocalcondit
7、ion,suchasmedicagoandplantcheckdamswithintheotherregionsoftheprojectinaccord—ancewiththeforecastedsoilandwaterlossandthecharacteristicsoftheprojectarea.Furthermore,severalreasonablesugges—tionsareputforwardhereinforimplementingthesoilandwaterconservationoftheprojectaswel1.Keywor
8、ds:reservoirandhydropower;newlyincreasedsoiland