复杂地质条件下隧道内合成轨枕式无砟轨道结构分析

复杂地质条件下隧道内合成轨枕式无砟轨道结构分析

ID:33394097

大小:2.95 MB

页数:74页

时间:2019-02-25

复杂地质条件下隧道内合成轨枕式无砟轨道结构分析_第1页
复杂地质条件下隧道内合成轨枕式无砟轨道结构分析_第2页
复杂地质条件下隧道内合成轨枕式无砟轨道结构分析_第3页
复杂地质条件下隧道内合成轨枕式无砟轨道结构分析_第4页
复杂地质条件下隧道内合成轨枕式无砟轨道结构分析_第5页
资源描述:

《复杂地质条件下隧道内合成轨枕式无砟轨道结构分析》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库

1、西南交通大学硕士研究生学位论文.第1I页AbstractTheDali-Ruilirailwaytunnelpassesthroughtheseriousgeologicaldiseaseplace-''threehighfouractive”,whichexiststheinfluencesofearthquake,water,spatialconstraint,longtunnelmaintenanceworkandotherfactors,thetrackstructureproperlyad

2、optsthetrackthatfeaturesassemblingtype,resistancetoerosion,unitformunballastedtrack.Byanalyzingstructuralcharacteristicsofvariousunballastedtrack,theDali—Ruilirailwayshouldadoptcompositesleeperunballastedtrack,theverticalstressanalysismodelofthetrackWa

3、sestablished,andthenbyusingfiniteelementthestructurestresscharacteristicsWasanalyzed,theeffectoffastener,resinmortar,bedboardsize,compositesleepersizeandotherparametersontrackstructureWasanalyzed;theboltsconnectsleepertoroadbedslab,andthestressofboltWa

4、sanalyzed,thenhavingdesignedtheboltdiameter;thesleeper’Ssupportingpatter!nWasstudiedandrelatedparameterswereoptimized;thecorrespondingconstructionprocessWasdesigned.Throughanalysisconclusionisdrawn,undertheverticalforce,rail’SmostverticaldisplacementOc

5、cursintheloadpositionalongthelinedirection,andthemorefarthedistancefromtheloadpositioninthebothsideis,themoresmalltheverticaldisplacementis;alongthesleeperlengthdirection,theverticaldisplacementandbendingmomentofthecompositesleepercomeuptothemaxinthelo

6、adposition,andthemiddlebendingmomentofcompositesleeperisverysmall,approachingzero;thefastenerhasthegreatereffectontheforceanddeformationoftrackstructure,thestiffnessandspacingoffastenertake50kN/mm,625mmproperly;theresinmortarhasthegreatereffectonthefor

7、ceanddeformationoftrackstructure,theelasticitymodulusandthicknessofresinmortarshouldtake300Mpa,30mmseparately;thebedboardwidthandthicknessaresuggestedtaking3000mm.200mmseparately;thecompositesleepersizerecommendsfor2400×200×140ram;thediameterofboltissu

8、gggestedtaking30mm.KeyWords:unballastedtrack;complexgeology;compositesleeper;resinmortar西南交通大学硕士研究生学位论文第1II页目录第1章+概述⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯11.1国内外高速铁路无砟轨道发展概况⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯11.1.1国内外高速铁路发展概况⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯.11.1.2国内外无砟轨道发展

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。