《桥梁限高架工程施工组织方案》由会员上传分享,免费在线阅读,更多相关内容在教育资源-天天文库。
1、范文范例参考指导桥梁限高架施工组织设计永煤公司铁路运输处word格式整理范文范例参考指导目录1工程施工模式···············································································22工程施工方案···············································································22.1开工前交底及开工准备会············································
2、············22.2钢结构制作················································································22.3现场施工····················································································32.4竣工验收·············································································
3、·······33限高架施工图纸···········································································44施工安全措施···············································································74.1一般要求····················································································8word格式整
4、理范文范例参考指导4.2钢轨搬动及运输安全································································84.3钢架加工安全措施····································································84.4用电安全····················································································84.5基坑施工·············
5、·······································································94.6钢结构(钢轨)吊装安全························································95施工所需机具、材料···································································94.1施工所需机械、工器具············································
6、················94.2施工所需材料············································································96工程概算·······················································································9word格式整理范文范例参考指导桥梁限高架施工组织设计1工程施工模式该工程为车集线地销路立交桥、雪枫路立交桥的限高防护架施工,防护架使用43kg/m钢轨制作,由铁运
7、处组织施工,具体分工为检修段负责按照图纸加工限高架,工务段负责限高架加工的监督和现场安装,供应科负责相关机具、材料的租用和购买。施工负责人分别为:检修段限高架制作负责人×××,分管领导×××。工务段施工负责人:×××;分管领导×××。主管科室管理人员:×××;负责领导×××。2工程施工方案2.1开工前交底及开工准备会:运输科组织工程相关单位现场交底,确定限高架设置的详细位置(明确到具体尺寸)、高度。同时举行开工准备会,统一协调限高架制作与施工过程中的责任分工及注意事项,明确施工各工序检查和验收的步骤,确定开工时间。2.2钢结构制作:钢结构制作前,工务
8、段试验5根钢轨按图纸的布置方法和跨度安装后,其下垂量达到多少,以根据桥梁高度具体确定限高架横梁高度。钢轨下垂