欢迎来到天天文库
浏览记录
ID:11405307
大小:623.00 KB
页数:106页
时间:2018-07-11
《碱炉拆安工程施工组织设计》由会员上传分享,免费在线阅读,更多相关内容在学术论文-天天文库。
1、金安浆业有限公司碱回收系统拆除、安装工程施工组织设计金安浆业有限公司碱回收系统拆除、安装工程施工组织设计目录第一篇工程概况及编制依据···················································1第二篇施工组织与管理·························································4第一章施工组织··································································4第二章施工管理·····························
2、·····································9第三章工程质量目标及质量保证措施····································12第四章安全生产与文明施工保证措施····································19第五章施工进度计划及保证措施··········································27第六章资源配置计划··························································29第七章成本控制措施··············
3、························湖南省工业设备安装有限公司105金安浆业有限公司碱回收系统拆除、安装工程施工组织设计····················32第八章特殊季节施工措施····················································33第九章施工平面布置··························································37第三篇施工技术措施···························································40第一章碱
4、回收锅炉拆除技术措施···········································40第二章VE预浓缩系统拆除及非标容器制安技术措施················45第三章汽轮发电机组拆除及安装技术措施······························53第四章碱回收锅炉安装技术措施··········································75第五章电气、仪表安装技术措施··········································87第六章防腐保温施工技术措施·····················
5、·························98第七章系统试验与工程验收················································101第八章包装与湖南省工业设备安装有限公司105金安浆业有限公司碱回收系统拆除、安装工程施工组织设计运输措施······················································103第一篇工程概况及编制依据1、工程概况金安浆业有限公司碱回收系统拆除、安装工程为拆除→包装→运输(雅安至海南洋浦,含卸车)→重新安装的交钥匙工程。拆除内容如下(主要设备装置):1)碱回收炉(630
6、t/d,约1500t)2)VE13)VE24)汽轮机(抽汽背压式600KW)5)冷却水塔6)稀黑液槽7)中浓黑液槽8)高浓黑液槽9)中间冷凝水槽10)污冷凝水槽11)VE表面冷凝器温水槽12)酸洗水槽除上述设备、装置及各种槽体外,还包括相关区域内的管道、钢结构以及相关的各种仪表、电气、电缆的拆除。其中属于保护性拆除的包括以下内容:碱回收炉包括厂房钢架、以上装置对应的所有主体设备、附属设备、管道、电气、仪表(包括电线、电缆、保温)。对保护性拆除的设备、装置、槽体、管道等,在拆除的同时要进行编号、整理、打包、装箱,之后经公路、铁路装运至海南省洋浦经济开发区海南金海浆纸厂,在厂内重新安装。目
7、前,需拆除的系统湖南省工业设备安装有限公司105金安浆业有限公司碱回收系统拆除、安装工程施工组织设计已停止运行,施工现场也基本具备开工条件,只待工程开标,即可进场开始施工。2、工程特点与要求1)作为拆除工程,施工难度很大,尤其是保护性拆除,在施工时必须注意被拆除件的质量,不能有多余的损坏。2)拆除、安装技术要求高。对于这种安装过的设备、管道等,在拆除前和拆除时都有不同程度的质量影响,有的甚至要采取一些必要的措施来消除这些影响。同时,在安装前还须
此文档下载收益归作者所有