1、富佳花苑防空地下室监理实施细则编写人:审核人:批准人:发布日期:江西省恒信建设工程监理咨询有限公司萍乡分公司25目录一、工程概况····················································································································3二、(人防区域)设计要求·······································································
2、·······················3三、监理依据···················································································································4四、监理目标················································································································
3、····4五、监理准备工作············································································································5六、监理工作流程············································································································525七、施工难点及监理重点············
4、··················································································11八、监理预控要点··········································································································12九、监理工作方法、措施及工程控制要点··············································
5、···················12一、工程概况本工程为莲花富佳花苑防空地下室设计,防空地下室上部为18层高层住宅,人防总面积为3005m2,共一个防护单元。本工程位于附建式防空地下室,平时功能为汽车库,战时功能为核6常乙类战时物质库。人防有效面积为2160m2,口部面积为297㎡。25建设单位:江西飞碟房地产开发有限公司设计单位:华优建筑设计院江西分院监理单位:江西省恒信建设工程监理咨询有限公司萍乡分公司施工单位:江西省辉煌建设集团有限公司质检单位:莲花县人防质监站二、监理依据1、国家和省、市有关工程建设的法律、法
6、规和有关文件;2、建设单位监理委托合同;3、建设单位与承包单位签定的工程承包合同及承包单位的企业标准;4、政府批准的建设计划、规划文件;5、设计文件(施工图、设计联系单、图纸会审记录等);6、国家现行的工程建设质量验收标准、施工质量验收规范。主要有:(1)《人民防空地下室设计规范》GB50038-2005(2)《建筑设计防火规范》GB50016-2006年版(3)《人民防空工程设计防火规范》GB50098-2009(4)《人民防空工程战术技术要求》RFJ015-20010(5)《地下工程防水技术规范》GB50108-200
7、8(6)《汽车库建设设计规范》JGJ100-2010(7)《人民防空工程防化设计规范》RFJ013-2010(8)《人防工程防化器材编配标准》RFJ014-2010(9)《人防工程防护设备选用图集》RFJ01-20087、有关人防工程的图集和材料设备标准;8、该工程有关合同、文件及技术资料;9、当地城建、人防部门制定或批准的有关建设文件;10、经审批的施工组织方案。25四、监理目标1.质量目标:一次验收合格。2.进度目标:在合同工期内竣工。3安全监理目标:无重大安全事故和管线事故,争创市级文明工地。五、监理准备工作1.人防
8、地下室施工前,监理组向公司办公室提供资源配备申请,包括与本工程相配套人员、检测设备、规范、标准图集等。2.监理组熟悉施工图纸及国家相应的人防规范等。3.编写人防监理细则并进行交底。4.总监组织监理组进行人防监理专业知识学习。5.检查施工单位设备、材料、人员准备情况,是否按既定的施工方案准备。六、监理工作