1、新桥润新公寓小区配电工程施工组织设计江苏广宇建设集团有限公司二O一二年九月十七日目录第一章工程概况及特点1.1工程概况······················································21.2工程特点······················································2第二章现场施工组织机构2.1施工现场组织机构关系图········································42.2工程主要负责人简介·······································
2、·····4第三章施工现场总平面布置图3.1施工现场平面布置图············································5第四章施工方案4.1施工准备······················································64.2施工工序总体安排··············································94.3主要工序和特殊工序的施工方法··································94.4工程成本控制·····························
3、·····················17第五章工期及施工进度计划5.1工期规划及要求················································225.2施工进度计划横道图············································22第六章质量目标、质量管理体系及技术组织措施6.1质量目标和承诺················································236.2质量管理方针及目标············································236
4、.3质量管理组织机构及主要职责····································246.4质量管理体系及质量检验的标准··································256.5质量管理组织措施··············································266.6质量保证的技术措施············································27第七章安全目标、安全管理体系及技术组织措施7.1安全管理指导方针及目标···································
5、·····287.2安全管理组织机构及主要职责····································297.3安全管理制度及办法············································317.4安全组织技术措施··············································357.5安全薄弱环节分析··············································37第八章环境保护及文明施工8.1环境保护·····································
6、·················398.2环境保护措施··················································398.3文明施工的目标、组织机构和实施方案····························408.4文明施工考核、管理办法········································42第一章工程概况及特点1.1工程概况1.1.1工程名称:新桥润新公寓小区配电工程1.1.2招标单位:靖江市润新投资建设有限公司1.1.3建设地点:靖江市新桥镇1.1.4招标范围:具体以施工图纸为准设置1座开闭所,1号
7、开闭所采用2进10出配置;采用SF6负荷开关;4台欧式箱变;户外布置,变压器与高低压室成目字型布置;规模为500KV变压器;10KV进线一回,线变组接线;0.4KV出线6回,单母线接线。1.1.5工期要求:2012年10月30日前完工。1.2工程特点1.2.1、工程特点1.2.1.1、本工程施工工期较紧,加上低温降雨,要求施工单位有较强的综合施工技术力量。并对各部分协调配合,人力物力合理安排,对特殊情况反应和处理效率提出较高要求,确保安全、保质、按期完成施工任务。1.2.1.2、