讨论地下连续墙施工难点

讨论地下连续墙施工难点

ID:15710359

大小:40.00 KB

页数:11页

时间:2018-08-05

讨论地下连续墙施工难点_第1页
讨论地下连续墙施工难点_第2页
讨论地下连续墙施工难点_第3页
讨论地下连续墙施工难点_第4页
讨论地下连续墙施工难点_第5页
资源描述:

《讨论地下连续墙施工难点》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库

1、http://www.tahsft.com/http://www.tajthg.cn/讨论地下连续墙施工难点【摘要】地下连续墙技术起源于欧洲,我国在二十世纪五十年代后期开始在水利部门推广应用这项技术。地下连续墙具有刚度大、防渗好、扰动小、环保等优点,但进行地下连续墙施工需要具有较高的技术水平与施工经验且施工难度较大。本文对地下连续墙在施工中的几个难点进行分析。【pickto】undergroundcontinuouswalltechnologyoriginatedinEuropeandinChinainthelate1950sbeganp

2、romotingapplicationofthistechnologyinwaterconservancydepartment.Undergroundcontinuouswallhasgreatstiffness,goodanti-seepage,smalldisturbance,environmentaladvantages,butneedtocarryontheundergroundcontinuouswallconstructionhashighertechnicallevelandtheconstructionexperience

3、andconstructionisdifficult.Inthispaper,theseveraldifficultiesinundergroundcontinuouswallinconstructionareanalyzed.  【关键词】地下连续墙;施工难点;分析;对策【keywords】undergroundcontinuouswall;Constructiondifficulties;Analysis;countermeasures     1前言http://www.tahsft.com/http://www.tajthg.cn

4、/1introduction  地下连续墙技术起源于欧洲,1950年意大利最先在工程中应用,我国在二十世纪五十年代后期开始应用这项技术。地下连续墙是通过专用的挖(冲)槽设备,沿着地下建筑物或构筑物的周边,按预定的位置,开挖出或冲钻出具有一定宽度与深度的沟槽,用泥浆护壁,并在槽内设置具有一定刚度的钢筋笼结构,然后用导管浇灌水下混凝土,分段施工,用特殊方法接头,使之连成地下连学的钢筋混凝土墙体,其主要用于:基坑开挖和地下建筑的临时性和永久性的挡土结构;地下水位以下的截水、防渗;部分工程的墙体还承受上部建筑的永久性荷载兼有挡土墙和承重基础作用;

5、邻近建筑物的支护;具有振动相邻影响的隔振墙等。UndergroundcontinuouswalltechnologyoriginatedinEurope,Italyin1950thefirstintheengineeringapplication,inthelate1950sbegantoapplicationofthistechnologyinourcountry.Undergroundcontinuouswallisthroughadedicatedtodig(rushed)slotdevices,alongthesurroundin

6、gundergroundbuildingsorstructures,accordingtothepredeterminedposition,theexcavationorimpactdrillwitharangeofwidthanddepthofgroove,usingslurrysupporting,andsetuparoundaslothasacertainstiffnessofstructureofreinforcingcage,andthenusecatheterpouringunderwaterconcrete,sectionc

7、onstruction,jointinaparticularway,makeitintoundergroundreinforcedconcretewall,evenlearnitishttp://www.tahsft.com/http://www.tajthg.cn/mainlyusedin:foundationpitexcavationandtheundergroundconstructionofthetemporaryandpermanentsoilretainingstructure;Undergroundwaterlevelbel

8、owthecutoff,seepagecontrol;Partofthewallstillundertheupperconstructionengineeringpermanentloadbo

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。