《便民服务中心施工组织设计》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库。
1、富文乡富文村社区便民服务中心工程施工组织计划目录第一章编制依据、工程概况及施工目标···························4一、编制依据···············································4二、工程施工使用的规范、文件································4三、工程概况及施工目标·····································5第二章施工管理部署···········································6一、施工准备工作计划·
2、·······································6二、施工总体构想············································7三、施工管理················································8四、项目部管理组织及班子配备································13五、项目主要岗位职责·······································13第三章施工现场总平面布置························
3、·············16-96-富文乡富文村社区便民服务中心工程施工组织计划一、施工现场平面布置原则···································16二、施工现场布置···········································17三、施工用电布置···········································17四、消防器材布置···········································18第四章主要施工方法·························
4、··················18第一部分室内安装··········································18一、内脚手架搭设施工技术··································18二、轻钢龙骨石膏板吊顶施工方法···························19三、材料及主要机具········································21四、石材墙柱面干挂施工方法································23五、墙地面防水施工方法··········
5、··························26六、石材楼面地面施工工艺·································-96-富文乡富文村社区便民服务中心工程施工组织计划26七、细石、砼楼地面施工工艺·································31八、玻璃隔断工程·········································33九、木门制作安装施工工艺·································37十、油漆涂刷施工方法··························
6、············40十一、拆除工程施工技术···································40第二部分钢结构夹层加固施工方案····························41第三部分电气设备、生活排水、综合布线工程····················44一、电气设备安装工程施工方法·····························44二、生活排水安装工程施工方法·····························46三、综合布线工程安装··································
7、····48第四部分室外消防、路灯、灌溉工程施工方法···················50一、消防措施的施工工序····································51-96-富文乡富文村社区便民服务中心工程施工组织计划二、室外灌溉施工方案······································53三、室外路灯施工方案······································53第五章工程投入的施工机械设备情况、主要施工机械进场情况········54第六章劳动力供应计划保证············
8、···················