电缆铺设施工技术交底

电缆铺设施工技术交底

ID:8359479

大小:51.00 KB

页数:11页

时间:2018-03-22

电缆铺设施工技术交底_第1页
电缆铺设施工技术交底_第2页
电缆铺设施工技术交底_第3页
电缆铺设施工技术交底_第4页
电缆铺设施工技术交底_第5页
资源描述:

《电缆铺设施工技术交底》由会员上传分享,免费在线阅读,更多相关内容在学术论文-天天文库

1、电缆敷设施工技术交底目录1范围32施工准备32.1设备及材料要求32.2主要机具32.3作业条件43操作工艺53.1工艺流程53.2准备工作53.3直埋电缆敷设63.4电缆沿支架、桥架敷设73.5挂标志牌84质量标准94.1保证项目94.2基本项目94.3电缆最小弯曲半径和检验方法应符合表2-l的规定105成品保护106应注意的质量问题117质量记录12potentialdetectionneedleP'toinsertgroundingveryE'andcurrentdetectionneedleC'Zhijian.WithwireE',P

2、',C',respectivelyconnectedtothecorrespondingterminalonthemetere,p,c.Groundingresistancetestwiringschematic5.3.3.2,potentialoftestmethodlocal,potentiallinkinstallationfinishedHou,shouldforguideproclaimtest,testwithpowercanusedno-loadvoltagefor4~24VofDCorExchangepower,testcur

3、rentnotshouldislessthan0.2A,if,potentiallinkTerminalBoardand,potentiallinkrangewithinofmetalpipeline,metalbodyendZhijianofresistanceisunlikelytoYuprovidesvalue,canthink,potentiallinkiseffectiveof,asfoundguidepassbadofpipelineconnectionat,shouldforacrosswiring.Atthetimeofcon

4、struction,requireclosecooperationamongvarioustypestoensureequipotentialbondingthealwaysconducting.Electricalcommissioningbeforecommissioningbeforepreparingserialnumbercheckingcontents1wireandinsulationresistancetestwiringconnectionscompleted,lightboxes,lamps,switches,outlet

5、s,insulationresistancetestingbeforetheseatedorfinishedbeforewiring,electricalequipmentandwiringinsulationresistancetest.2groundingorthecheckingofzero:reviewonebyoneislocatedinthesourcingiscorrect,contactissolidandreliable,isproperlyconnectedtogroundonline;devicesclosetotheb

6、aregroundingconductororneutralconnectioniscomplete;pointshouldbeconnectedtothegroundinggrid,cannotbeusedinthebodyofthedevice;Equipmentgroundingshouldcontactisgood,solid,reliableandidentifiedtheobvious.7.1质量保证资料127.2施工记录121范围potentialdetectionneedleP'toinsertgroundingveryE'a

7、ndcurrentdetectionneedleC'Zhijian.WithwireE',P',C',respectivelyconnectedtothecorrespondingterminalonthemetere,p,c.Groundingresistancetestwiringschematic5.3.3.2,potentialoftestmethodlocal,potentiallinkinstallationfinishedHou,shouldforguideproclaimtest,testwithpowercanusedno-

8、loadvoltagefor4~24VofDCorExchangepower,testcurrentnotshouldislessthan0.2A,if,poten

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。