《东岸国际别墅施工组织设计.doc》由会员上传分享,免费在线阅读,更多相关内容在应用文档-天天文库。
1、目录1、编制目的、编制依据················································012、工程概况和工程特点················································013、关键部位和关键过程的确定和相应措施································014、施工现场总平面图··················································035、施工部署···································
2、·······················066、项目组织机构及项目管理模式········································107、实施目标··························································158、施工区域及任务的划分··············································159、各分部分项工程的主要施工方案和技术措施····························1510、物资供应、各专业工种施工配合措施··
3、·······························5211、工程进度计划及保证措施···········································5212、质量保证和质量控制计划和措施及成品保护措施·······················5613、安全生产和环境保护计划和技术保证措施·····························6714、现场文明施工的技术措施和现场CI视觉识别体系的实施计划············7315、其他主要技术方案································
4、·················7616、施工进度网络计划图···············································8117、合同管理计划·····················································8318、分包管理(总承包管理)············································8419、施工临时场地和临建平面图以及用水、用电负荷计算···················8520、工程主要设备、材料、构件的用量计划·········
5、······················8721、劳动力计划·······················································8822、农忙季节、主要假日的劳动力安排···································8923、工程投入的主要施工机械设备,施工机械进场计划、测量、质检仪器设备·8924、与参建各方的配合与协调措施·······································9125、推行现场信息管理技术及计算机管理技术及有必要说明的其他内容·······91
6、26、服务:回访保修措施···············································94施工组织设计1、编制目的与编制依据1.1、编制目的按期保质交付工程,实现工程的设计意图及各种目标,尽可能获得业主满意。1.2、编制依据本工程投标方案依据招标文件、设计图纸、答疑文件及国家有关法律、法规并结合现场实际等要求进行编制。2、工程概况与工程特点2.1、土建部分概况2.1.1、建筑工程概况:本工程为东岸国际B区中心别墅区工程,位于呼和浩特市东河滨河东区,东临规划4#街,南临规划6#路,西侧为滨河东路,北侧为4#路,为居住小区。各
7、工程详细概况见后附表。2.1.2、结构概况:本工程结构安全等级二级,合理使用年限50年;结构类型为剪力墙结构,抗震设防分类为丙类建筑,抗震等级三级;基础为钢筋砼条形基础,地基基础设计等级丙级;工程所处地区抗震设防烈度为8度,建筑场地类别Ⅱ类,场地标准冻深1.60m;钢筋采用HPB235级、Q235、HRB400级钢筋;基础和地下室外墙均做刚性自防水,设计抗渗等级为P6;结构砼的环境类别为:±0.00以下为二类b,±0.00以上为一类。各工程详细概况见后附表。2.2、安装部分概况本工程施工范围包括:室内给水、排水系统,采暖系统,建筑电气系统。2.3、工程特
8、点2.3.1、本工程为群体工程,共由41幢别墅组成,工作面大;2.3.2、现场地