欢迎来到天天文库
浏览记录
ID:60849837
大小:114.50 KB
页数:2页
时间:2020-12-23
《R600a制冷剂温度压力对照表教学教材.doc》由会员上传分享,免费在线阅读,更多相关内容在教育资源-天天文库。
1、…………………………………………………………最新精品资料推荐……………………………………………………R600a制冷剂温度压力对照表温度℃绝对压力MPa温度℃绝对压力MPa温度℃绝对压力MPa温度℃绝对压力MPa温度℃绝对压力MPa-500.0168-100.108140.252380.511701.087-450.0221-90.113150.261390.524751.21-400.0287-80.117160.27400.538801.344-350.0367-70.122170.277410.552851.487-300.0466-60.127180.287420.566901.642
2、-290.049-50.131190.294430.581注:-280.051-40.133200.305440.596绝对压力与表压力的换算关系-270.054-30.142210.313450.612-260.056-20.147220.324460.628绝对压力(MPa)--250.058-10.152230.332470.6450.1MPa(大气压力)=-240.06100.158240.344480.661表压力(MPa)-230.06410.164250.353490.679 -220.06720.168260.365500.69-210.0730.176270.375510.
3、709-200.07240.182280.385520.727-190.07650.187290.398530.746-180.07960.195300.408540.766-170.08270.201310.419550.786-160.08580.208320.43560.799-150.0990.215330.445570.82-140.093100.222340.457580.842-130.097110.229350.469590.856-120.1120.237360.481600.894-110.105130.245370.494650.974历年真题(2018.31)背景资料
4、某公司承包一座雨水泵站工程,泵站结构尺寸为23.4m(长)×13.2m(宽)×9.7m(高),地下部分深度5.5m,位于粉土、砂土层,地下水位为地面下3.0m。设计要求基坑采用明挖放坡,每层开挖深度不大于2.0m,坡面采用锚杆喷射混凝土支护,基坑周边设置轻型井点降水。基坑临近城市次干路,围挡施工占用部分现况道路,项目部编制了交通导行图(见图1)。在路边按要求设置了A区、上游过渡区、B区、作业区、下游过渡区、C区6个区段,配备了交通导行标志、防护设施、夜间警示信号。基坑周边地下管线比较密集,项目部针对地下管线距基坑较近的现况制定了管线保护措施,设置了明显的标识。1.项目部的施工组织设计文件中包
5、括质量、进度、安全、文明环保施工、成本控制等保证措施;基坑土方开挖等安全专项施工技术方案,经审批后开始施工。2.为了能在雨期前完成基坑施工,项目部拟采取以下措施:(1)采用机械分两层开挖;(2)开挖到基底标高后一次完成边坡支护;(3)机械直接开挖到基底标高夯实后,报请建设、监理单位进行地基验收。…………………………………………………………最新精品资料推荐……………………………………………………2…………………………………………………………最新精品资料推荐……………………………………………………图1 交通导行平面示意图问题:1.补充施工组织设计文件中缺少的保证措施。2.交通导行示意图中,A、
6、B、C功能区的名称分别是什么?3.项目部除了编制地下管线保护措施外,在施工过程中还需具体做哪些工作?4.指出项目部拟采取加快进度措施的不当之处,写出正确的做法。5.地基验收时,还需要哪些单位参加?…………………………………………………………最新精品资料推荐……………………………………………………2