导流洞监理工作报告

导流洞监理工作报告

ID:6031154

大小:90.00 KB

页数:16页

时间:2017-12-31

导流洞监理工作报告_第1页
导流洞监理工作报告_第2页
导流洞监理工作报告_第3页
导流洞监理工作报告_第4页
导流洞监理工作报告_第5页
资源描述:

《导流洞监理工作报告》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库

1、XXX东方红水利工程导流洞工程工程建设监理工作报告重庆市XX工程监理有限公司XXX水利工程监理部目录第一章工程概况··························1第二章监理规划··························12.1监理机构组建····························12.2监理工作目标··························12.3监理工作制度···························22.4监理工作程序···························22.3监理工作内容················

2、···········3第三章监理过程··························33.1审查设计文件和施工图纸·······················33.2技术交底···························33.3审查施工文件···························33.4审查施工单位资质···························33.5签发开工令···························33.6原材料和半成品的控制···························43.7工程质量控制··········

3、·················43.83工程进度控制···························53.9工程投资控制···························53.10安全控制···························53.11合同管理···························6第四章 监理效果··························74.1项目划分····························74.2施工检测及抽检结果·································94.3回填、固结灌

4、浆检测结果·························104.4锚杆抗拔试验·························104.3设计变更·····························104.3质量评定结果···························11第五章经验与建议·························115.1经验与主要体会·························115.2建议······························123附件一·······························13工

5、程大事记·····························133石柱县东方红水利工程导流洞工程第一章工程概况XXXXXXXXXXXXXXXXX村,长江一级支流龙河二级支流龙洞溪中游,地理位置坐标界于东经108°13′~108°14′,北纬30°11′~30°18′之间,距悦崃镇约3km,距石柱县城约33km。大坝为埋石混凝土重力坝,最大坝高57.6m。东方红水利工程首部枢纽导流洞由进口明渠段、进口闸室段、洞身段和出口明渠段、临时施工10KV配电工程(含枢纽区)等组成。导流洞洞身全长318.13m(洞挖段长度),断面为城门洞型,净断面尺寸为2.50×3.00m(宽×高m

6、),进口高程为932.00m,出口高程为920.00m,纵坡为i=0.038。其中进口明渠段长约20.00m,闸室段长6.00m,设置叠梁门槽,备导流洞下闸时使用,出口明渠段长约20.00m,设计流量45.8m/s。工程建设单位:;工程设计单位:;工程监理单位:;工程施工单位:;工程检测单位:;第二章监理规划2.1监理机构组建重庆市XX工程监理有限公司与XX利水电有限公司签订了《石柱县东方红水利工程》施工监理合同,随后于2013年9月5日成立了石柱东方红水利工程监理部,委派XXX为总监理工程师,XXX为总监理工程师代表XXX为监理工程师,负责整个工程的监理工作,总监理工程师为

7、项目监理的行政和技术负责人,全面履行合同条款,直接向业主及公司负责。渝2.2监理工作目标2.2.1质量目标:合格率100%。2.2.2安全目标:重大安全事故为零。2.2.3投资目标:工程合同价为5019099.98元(其中:临时工程804150元为总价承包,其余项目为单价承包)。122.2.4合同工期目标:合同工期为6个月2.3监理工作制度2.3.1设计文件、图纸审查制度2.3.2技术交底制度2.3.3开工报审制度2.3.4材料、构件检验及复验制度2.3.5设计变更和技术核定制度2.3.6工程质量监理制

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。