1、EarthworkExcavationand3:7LimeSoilBackfillingConstructionMethodStatement土方开挖及灰土换填施工方案一、ConstructionScope施工范围Thisconstructionwillapplytobuilding12Chemicalandbuilding13Waste.本次进行施工的建筑为12号单体化学品及危废库和13号单体废品库。二、CompilationBasis编制依据1、Constructionblueprint施工蓝图2、Onsiteactualcondition现场实际情况3、UnifiedStandar

2、dforConstructionalEngineeringConstructionQualityAcceptance《建筑工程施工质量验收统一标准》GB50300-20134、GroundFoundationConstructionEngineeringConstructionQualityAcceptanceSpecifications《建筑地基基础工程施工质量验收验收规范》GB50202-20025、ConstructionSlopeEngineeringTechnicalSpecifications《建筑边坡工程技术规范》(GB50330-2013)6、ConstructionGr

3、oundFoundationTreatmentTechnicalSpecifications《建筑地基处理技术规范》(JGJ79-2012)三、ExcavationMethod开挖方法四、ChemicalBuilding:thebuilding isreinforcedconcreteframestructure, independentfoundation, bottomelevationoffoundation-1.8m,with1mthick3:7 limesoilbackfillunderthefoundation,thebottomelevationoflimesoilback

4、fillinglayerunderthefoundationis-2.9m.Thefloor isarchitecturefloor, and limesoil backfill layer bottomelevation undertheflooris-0.97m, building ±0.00 isequivalenttotheabsoluteelevationof +450.1m.Considering theabovefactors, thefoundationshallbeexcavatedmassivelyonthewholeto-0.97m,andthenexcavated

5、intheshapeofstripealongthegridsof J1、J2、J3to-1.900,thebottomelevationofthespacerofthepilecap.Ifthereisaneedtoslope,abidebytherockandsoilreportandsafetyrequirement.1:0.75slopingissuitable.1、化学品及危废库:该建筑为钢筋混凝土框架结构,基础采用独立基础,基础底面标高为-1.8m,基础下需进行3:7灰土回填施工,回填厚度1m,基础下灰土回填层底面标高为-2.9m,地坪为建筑地坪,地坪下灰土回填层底面标高为-

6、0.97m,建筑±0.00相当于绝对标高+450.1m,综合上述因素,本建筑基础土方开挖采用整体开挖至-0.97m,再沿J1、J2、J3轴方向条形开挖,开挖至承台垫层底标高-1.900,然后在每个基础承台位置进行条状开挖,开挖至灰土换填层底标高-2.900。开挖过程中需要放坡时应按岩土报告及安全要求进行放坡。以1:0.75放坡为宜。Excavationsequencediagram开挖顺序图Foundationpitprofilemap基坑剖面图TheWasteBuilding: upperstructureof waste warehouseissteelstructure,found

7、ation isanindependentfoundation, ±0.00isequivalenttotheabsoluteelevation+449.4m, foundationbottom elevationis-1.8m.Workmethodforlimesoiltreatmentunderthefoundationandthedetailsforarchitecturefloorarethesamewithbuilding

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。