1、...××××××××××门架设施工程《施工组织设计方案》a...××××××××有限公司20年月日目录一、工程概述·····················································································3二、编制依据及执行标准·····································································3三、工程施工方案···································································

2、·············4a...四、施工进度安排················································································5五、劳动力计划···················································································5六、主要施工机械设备··········································································5七、门架制作···········

3、·············································································7八、 门架安装························································································8九、施工安全管理措施·······································································10十、安全文明施工措施·································

4、······································12十一、工程质量保证措施·······································································16十二、施工管理机构配置·······································································17《施工组织设计方案》一、工程概述:1.施工项目:×××××××××门架设施工程安装施工。2.工程地点及结构概况:2.1××××××路×座跨度××米,净空高度××米门架;a...2.2×

5、×××××路×座跨度分别是××米和××米,净空高度××米门架;2.3××××××路×座跨度分别是××米、××米和××米,净空高度××米门架。3.工期要求:计划20××年××月××日开工,20××年××月××日竣工,总工期××个日历天。4.工程围:按业主方招标文件工程量清单及对应施工图纸上涵盖的所有门架设施工作容,本工程施工围包括门架基础的现场浇筑、门架设施在生产车间的加工制作和门架设施的现场安装施工。二、编制依据及执行标准:1.根据业主的施工合同文件、答疑文件及全套施工图纸、工程清单等;2.《公路养护安全作业规程》(JTGH30-2015);3.《道路交通标线和标志》(GB5768-2009)

6、;4.钢结构设计规(GB50017-2014);5.钢结构工程施工及验收规(GB50205-95);6.钢结构工程施工质量验收规(GB50205-2001);7.钢结构焊接规(GB50661-2011);8.钢结构工程施工规 (GB50755-2012);以及工程执行的现行、地方颁布的标准规、规程及相关政策法规。三、工程施工方案:1.施工准备:开工前进行技术交底及开工准备会,组织工程相关单位a...进行现场交底,确定限高架设置的详细位置(明确到具体尺寸)、高度,同时举行开工准备会,统一协调限高架制作与施工过程中的责任分工及注意事项,明确施工各工序检查和验收的步骤,确定开工时间;   2.组织有

7、关工程管理和技术人员对设计图纸进行会审。对图纸不明确及施工中有困难的地方,要与设计单位作好变更鉴证手续;   3.根据施工图纸结合本单位的设备和技术条件,制定出工程的具体施工方案,并提出材料和工程资金的保障计划;   4.对门架工程所使用的机械和检测设备的性能进行检验,保证施工过程中各种设备的工作状态良好,使用功能齐全;   5.门架工程所使用的材料除应有质量证明书外,还应符合设计标准方可使用; 

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。