1、沣西新城应急给水厂项目深井泵房工程施工方案编制:审核:批准:日期:年月日60/66目录第一章编制依据编制依据··············································1第二章工程概况第一节深井泵房施工概况······································1第四节电气自控施工概况······································2第三章项目经理部组成人员第一节项目经理部组织机构成人员·····························3
2、第二节项目经理部机构组织···································4第三节项目经理部各级岗位职责·······························5第四节施工中平面布置图·····································6第四章劳动力、材料、机械设备投入计划60/66第一节施工材料投入计划·····································7第二节劳动力安排计划·······································8
3、第三节安全防护用品计划·····································8第四节检测仪器设备计划·····································9第五章施工方案第一节测量放线··············································9第二节基础施工·············································10第三节主体工程·············································
4、13第四节装饰、装修工程········································23第五节60/66屋面防水工程·········································26第二节脚手架工程···········································28第三节给排水及电气安装工程·································33第六章施工进度计划及工期保证措施第一节施工进度计划····························
5、·············35第二节工期保证措施·········································37第三节工程质量保证措施·····································43第四节冬期施工措施·········································47第五节安全施工措施·········································48第六节文明施工及环境保护措施··························60/6
6、6·····5360/66第一章编制依据编制依据:1、《建筑工程施工质量验收统一标准》GB50300-20132、《砌体工程施工质量验收规范》GB50203-20113、《混凝土结构工程施工质量验收规范》GB50204-20023、《砌体结构设计规范》GB50003-2001(2002年局部修订)4、《多孔砖砌体结构技术规范》JGJ137-2001(2002年局部修订)5、《建筑地基基础工程施工质量验收规范》GB50202-20026、《砌筑工程施工质量验收规范》GB50203-20147、《屋面工程施工质量验收规范》GB5
7、0207-20024、《工程测量规范》GB50026-935、《建施扣件式刚管脚手架安全技术规程及验收规范》JGJ128-20007、《砌筑砂浆配合比设计规程》JGJ98-2000第二章工程概况工程名称:沣西新城应急给水厂深井泵房工程建设单位:西咸新区沣西新城投资发展有限公司设计单位:西安市政设计研究院有限公司工程地点:西咸新区沣西新城渭河大堤东侧第一节建筑部分60/66深井泵房采用地面式砖混结构,其中A型深井泵房由2号泵房、4号泵房、5号泵房、7号泵房、12号泵房、13号泵房、15号泵房,井泵房设计尺寸为4.5mx4.5m
8、;B型深井泵房由6号泵房、8号泵房、9号泵房、10号泵房、11号泵房、14号泵房、16号泵房、17号泵,深井泵房设计尺寸为9.3mx4.5m;C型深井泵房为1号泵房,泵房设计尺寸为9.3mx4.5m;D型深井泵房为3号泵房,泵房设计尺寸为9.3mx4.5m。本次施工的11号、12号及15号