1、参考答案案例一项目名称计算式建筑面积(m2)挑廊S=10*1.4=14.00凹阳台S=3.6*1.8*1/2=3.24半凹半挑阳台S=[3*2+(3-0.12*2)*0.8]*1/2=4.10挑阳台S=2.8*2*1/2=2.80案例二表二1,挖土深度:1.6m1.7m89.93205.42计算式V=1/3*1.7*[(2.3+0.3*2)2+(2.3+0.3*2+2*0.33*1.7)2+(2.3+0.3*2)*(2.3+0.3*2+2*0.33*1.7)]*10=1/3*1.7*(8.41+
2、16.176+11.664)*10=205.416(题干计算说明明要求将工作面及放坡方量计入清单工程量中)2,67.98186.83计算式:V=205.416-5.29-11.373-1.92=186.8333,11.4018.58计算式:V=205.416-5.29-186.833=18.584项目编码:010404001001(此为除砼垫层以外垫层项目)0105010010014.415.29计算式:V=2.3*2.3*0.1*10=5.295,10.411.37计算式:V方台=2.1*2.
3、1*0.15=0.6615V棱台=1/3*0.25[(0.4+0.5*2)2*+2.12+(0.4+0.5*2)*2.1]=0.476V=(0.6615+0.4758)*10=11.3736,2.721.92计算式:V=0.4*0.4*1.2*10=1.92表三工程量:2.721.92清单项目综合单价:630.48序号定额编号定额项目单位数量综合单价单价合价1AD0063现浇C20砼矩形柱m32.72235.45640.422 1.92 687.513TB0010现浇砼模板安装、拆除矩形柱m
4、219.2027.24523.014 清单项目合价m32.72235.45640.425 1.92 1210.526 清单项目综合单价m31.00235.45 7 630.48 表四工程量:79.38205.42清单项目综合单价:19.2114.75序号定额编号定额项目单位数量综合单价单价合价1AA0004挖基坑土方深2m内m3103.1912.221157.192 205.42 2510.233AA0015人力车运土方运矩50m内m3103.193.62373.554 143.
5、79 520.525 清单项目合价m3103.19 1531.346 205.42 3030.757 清单项目综合单价m31.0019.29 8 14.75 模板计算式S=0.4*4*1.2*10=19.2人力运土方计算式V=205.42*0.7=143.79案例三1,0111020300101110203001*62.6457.83计算式:S=(3.6-0.24)*(5.8-0.24)*3+0.24*1.2+0.24*0.9+(5.8-0.24*2)*0.24=57.826(13规范
6、与09定额计算规则不同)坑爹2,5.404.84计算式:S=[(3.6-0.24+5.8-0.24)*2+(5.8-0.24+7.2-0.24)*2+0.12*4-0.9*2-1.2]*0.12=4.8433,147.84117.47计算式:S=[(3.6-0.24+5.8-0.24)*2+(5.8-0.24+7.2-0.24)*2+0.12*4]*(3.3-0.13)-0.9*2*2-1.2*2.4-1.5*1.8*5=117.4714,62.6457.38计算式:S=(3.6-0.24)*(
7、5.8-0.24)+(5.8-0.24)*(7.2-0.24)=57.379(13规范不扣除间壁墙、垛、柱、附墙烟囱、检查口和管道所占面积)5,139.44132.88计算式:S=[5.8+0.24+10.8+0.24+(0.02+0.008+0.01)*2]*2*(4.2+0.15)-1.2*2.4-1.5*1.8*5=132.8776,4.625.35计算式:S=[1.2-0.018+2.4*2-0.018*2+(1.5-0.018*2+1.8-0.018*2)*2*5]*0.14=5.35
8、27,011001003001011001003001*139.44132.22计算式:S=(5.8+0.24+10.8+0.24)*2*(4.2+0.15)-1.2*2.4-1.5*1.8*5=132.2168,210.48179.67计算式:S=117.471+57.379-0.12*.24*2+[(2*2+0.9)*2+1.2+2.4*2+(1.5+1.8)*2*5]*0.1=179.6729,项目编码:010404001001(此为除砼垫层以外垫层项目)0105010010016.265