1、中国石油克拉玛依石化公司热电厂烟气脱硫扩能及隐患治理项目精品文档,超值下载湿式除尘器系统安装施工组织设计批准:审核:编制:浙江宏电环保科技有限公司二O一六年六月二十五日目录1、工程概况·······························································································································································12、编制依据

2、·······························································································································································13、施工作业准备工作························································································

3、························································14、湿式除尘器安装及调试········································································································································85、质量控制和质量标准·········································

4、·································································································186、防腐施工措施····················································································································································187

5、、安全文明施工措施··············································································································································198、环境因素的识别和评价环境保护管理·······················································································

6、·······················209、重要环境因素的控制措施·································································································································22专注做自己想要的1、工程概况1.1概况工程名称:中国石油克拉玛依石化公司热电厂烟气脱硫扩能及隐患治理项目建设单位:中国石油克拉玛依石化公司建设地点:中国新疆克拉玛依市中国石油克拉

7、玛依石化公司热电厂院内本工程由陕西西安航天动力研究所总承包,浙江宏电环保科技有限公司负责湿式电除尘器的设计、供货及安装。本工程中的吸收塔出口增设湿式电除尘,将烟气进一步处理后,汇入主烟道。1.2湿式电除尘安装主要工程量湿式电除尘安装包括以下项目:入口膨胀节安装、壳体安装,导流格栅安装、电晕极系统安装、集液槽安装、拉紧装置安装、喷淋系统安装、阳极及阴极系统安装、顶部锥体及出口膨胀节安装、顶部吊车安装。2、编制依据DL/T5417-2009《火电厂烟气脱硫工程施工质量验收及评定规程》DL/T5210.2-2009《

8、电力建设施工质量验收及评价规程》锅炉机组篇DL/T5210.5-2009《电力建设施工质量验收及评价规程》管道及系统DL5009.1-2002《电力建设安全工作规程》我方提供的施工图纸及相关技术资料脱硫的安装设计文件有关安装、质量、安全的会议纪要3、施工作业准备工作3.1人力资源项目管理组织机构3.1.1我们将把本工程作为公司重点工程建设项目进行组织施工,任命具有同类工程项目管理经验的

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。