1、堤防渗流计算(有详细的计算过程和程序)根据堤《防工程设计规范GB50286-98 》附录E.2.1 不透水堤基 均质土堤 下游无排水设备或有贴坡式排水 项目 计算式 数值 单位 备注上游坡度m1 = 3 = 3 / 1:m1下游坡度m2 = 3 = 3 / 1:m2堤顶宽度B = 6 = 6 m 堤顶高程▽顶 = 27 = 27 m 堤底高程▽底 = 17 = 17 m 上游水位▽1 = 24.8 = 24.8 m 下游水位▽2 = 18 = 18 m 渗透系数k = 1.00E-05 = 1.00E-0
2、5 m/s 堤身高度H = 27-17 = 10 m 上游水深H1 = 24.8-17 = 7.8 m 下游水深H2 = 18-17 = 1 m L = (27-24.8)×3+6+10×3 = 42.6 m 上有水面至下游堤脚ΔL = 3×7.8/(2×3+1) = 3.343 m m1H1/(2m1+1)L1 = 42.6+3.343 = 45.943 m L+ΔL试算法计算逸出高度h0,假设h0的试算范围h01~h02,计算的步长以及精度 h01 = 1 = 1 m h02 = 10 = 10 m 步长
3、= 0.02 = 0.02 m 精度 = 0.01 = 0.01 m 试算得到h0 = 2.54 = 2.54 m 手动输入q/k = (7.8^2-2.54^2)/(2×(45.943-3×2.54)) = 0.7096 m q/k = 0.7047 = 0.7047 m 平均q/k = (0.7096+0.7047)/2 = 0.7072 m 平均渗流量q = 0.7072×0.00001 = 7.07E-06 m3/s/m 浸润线方程 y=SQRT(6.4516+1.4144x) 下游坝坡最大渗出坡降J
4、= 1/3 = 0.333 / 1/m2附录E.2.2 不透水堤基 均质土堤 下游设褥垫式排水堤防渗流计算(有详细的计算过程和程序)根据堤《防工程设计规范GB50286-98 》附录E.2.1 不透水堤基 均质土堤 下游无排水设备或有贴坡式排水 项目 计算式 数值 单位 备注上游坡度m1 = 3 = 3 / 1:m1下游坡度m2 = 3 = 3 / 1:m2堤顶宽度B = 6 = 6 m 堤顶高程▽顶 = 27 = 27 m 堤底高程▽底 = 17 = 17 m 上游水位▽1 = 24.8 = 24.8
5、m 下游水位▽2 = 18 = 18 m 渗透系数k = 1.00E-05 = 1.00E-05 m/s 堤身高度H = 27-17 = 10 m 上游水深H1 = 24.8-17 = 7.8 m 下游水深H2 = 18-17 = 1 m L = (27-24.8)×3+6+10×3 = 42.6 m 上有水面至下游堤脚ΔL = 3×7.8/(2×3+1) = 3.343 m m1H1/(2m1+1)L1 = 42.6+3.343 = 45.943 m L+ΔL试算法计算逸出高度h0,假设h0的试算范围h01~h02,计
6、算的步长以及精度 h01 = 1 = 1 m h02 = 10 = 10 m 步长 = 0.02 = 0.02 m 精度 = 0.01 = 0.01 m 试算得到h0 = 2.54 = 2.54 m 手动输入q/k = (7.8^2-2.54^2)/(2×(45.943-3×2.54)) = 0.7096 m q/k = 0.7047 = 0.7047 m 平均q/k = (0.7096+0.7047)/2 = 0.7072 m 平均渗流量q = 0.7072×0.00001 = 7.07E-06 m3/s/
7、m 浸润线方程 y=SQRT(6.4516+1.4144x) 下游坝坡最大渗出坡降J = 1/3 = 0.333 / 1/m2附录E.2.2 不透水堤基 均质土堤 下游设褥垫式排水项目 计算式 数值 单位 备注上游坡度m1 = 3 = 3 / 1:m1下游坡度m2 = 5 = 5 / 1:m2堤顶宽度B = 6 = 6 m 堤顶高程▽顶 = 27 = 27 m 堤底高程▽底 = 17 = 17 m 上游水位▽1 = 24.8 = 24.8 m 下游水位▽2 = 18 = 18 m 褥垫长度Lr = 5 = 5
8、 m 到下游堤脚渗透系数k = 1.00E-05 = 1.00E-05 m/s 堤身高度H = 27-17 = 10 m 上游水深H1 = 24.8-17 = 7.8 m 下游水深H2 = 18-17 = 1 m L = (27-24.8)×3+6+10×5-5 = 57.6 m 上游水面至褥垫ΔL = 3×7.8/