1、桥梁建设2011年第5期文章编号:1003—4722(201I)05—0006—05安庆长江铁路大桥3号桥塔墩钢护筒群施工技术黄旺明,皮军云(中铁大桥局集团有限公司,湖北武汉430050)摘要:安庆长江铁路大桥为双塔钢桁梁斜拉桥,其3号桥塔墩为大直径深水钻孔桩基础,采用钢围堰法施工。由于墩位处河床覆盖层厚不足1m,钢套箱围堰下沉着床后,河床基本冲刷为光板岩,为解决钻孔桩钢护筒的安装及定位问题,除中心钢护筒直接下沉安装外,其余36根钢护筒按区域分为A、B、C三类5组分批整体制造安装。护筒群A、B在码头上整体制造组拼后船运至墩位,利用浮吊整体下放后悬挂在围堰上,利用悬挂系

2、统及导向槽结构调整并精确定位;护筒群C随围堰底节一同下沉着床。全部护筒安装定位后,在护筒内填砂堵漏、分层浇注水下封底混凝土以预埋固定钢护筒,最后进行钻孔桩施工。关键词:安庆长江铁路大桥;斜拉桥;钻孔桩;摩擦桩;钢护筒群;桥梁施工中图分类号:U448.27;U445.551文献标志码:AConstructionTechniquesforSteelCasingGroupsofPylonPierNo.3ofAnqingChangjiangRiverRailwayBridgeHUANGWang—mingtPIdun。yun(ChinaRailwayMajorBridgeEng

3、ineeringGroupCo.,I.td.,Wuhan430050,China)Abstract:AnqingChangjiangRiverRailwayBridgeisasteeltrussgirdercable—stayedbridgehavingdoublepylons.ThePylonPierNo.3ofthebridgerestsonthedeepwaterlargediameterboredpilefoundationthatwasconstructedbythesteelboxedcofferdammethod.Sincetheriverbedover

4、burdenatthe1ocationofthepieriSnotdeeperthan1m,theriverbedwasscouredalmostintobareslateshortlyafterthesteelboxedcofferdamwassunkdownandlandedthere.I'ore~solvetheproblemofinstallingandpositioningthesteelcasingsforconstructionoftheboredpiles,withtheexceptionthatcentralsteelcasingwasdirectl

5、ysunkdownandinstalled,therestofthe36stee1casingswereclassifiedinto3kindsofA,B,Cand5groupsinaccordancewiththedifferentareasofthefoundationandweretobeintegrallyfabricatedandinstalledinbatches.ThesteelcasinggroupsAandBwerefirstlyfabricatedandassemblednearbythewharf,shippedtothepiersite,int

6、egrallylowereddownandsuspendedontothecofferdambyfloatingcraneandad—justedandpreciselypositioned,usingthesuspensionsystemandguidinggroovestructure.ThesteelcasinggroupCwasthensunkdowntotheriverbedtogetherwiththebottomliftofthecolferdam.Afterallthesteelcasingswerewellinstalledandpositioned

7、inplace,thecasingswerefilledwithsandtostopwaterfromcomingin,thebasesealingtremieconcretewasdepositedinlayerstofixthecasingsandfinallytheconstructionoftheboredpileswastoproceed.Keywords:AnqingChangjiangRiverRailwayBridge;cable—stayedbridge;boredpile;fric~tionalpile;steelcasinggr

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。