砂土与全风化花岗岩中双线盾构隧道近距离下穿高架桥的影响分析

砂土与全风化花岗岩中双线盾构隧道近距离下穿高架桥的影响分析

ID:33071899

大小:4.41 MB

页数:109页

时间:2019-02-19

砂土与全风化花岗岩中双线盾构隧道近距离下穿高架桥的影响分析_第1页
砂土与全风化花岗岩中双线盾构隧道近距离下穿高架桥的影响分析_第2页
砂土与全风化花岗岩中双线盾构隧道近距离下穿高架桥的影响分析_第3页
砂土与全风化花岗岩中双线盾构隧道近距离下穿高架桥的影响分析_第4页
砂土与全风化花岗岩中双线盾构隧道近距离下穿高架桥的影响分析_第5页
资源描述:

《砂土与全风化花岗岩中双线盾构隧道近距离下穿高架桥的影响分析》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库

1、上海交通大学硕士学位论文ABSTRACTcontrolofexcavation.(2)Theresearchandanalysisofshieldcrossingconstructionparameterschange,theviaductbeforeandafterresearchshowedthat:ShieldCrossingtheviaduct,maintainthecutterheadtorqueconstant,respectively,tothetopofthethrustandsoiltankpressureincreasedby3.6

2、%,6.7%,canputthecontrolinthe5mmwithinthelimitsofsettlementpier,ensurethesafetyofbridgestructure.(3)Theeffectoftheruleofdoublelineshieldconstructionenvironmentwasstudiedbytheanalysisofengineeringtestdata.Experimentalresultsshowthat:①Thegroundsubsidencehistoryassociatedwiththeshie

3、ldmachineheadposition,theshieldmachineheadthroughtherapidgrowthofsettlementpoint,growthrateislessthan0.85mm/days;eachmeasuringpointofthefinalsettlementandincisionthroughthemeasurementpointdrivingvelocity,settlementpointrelativelysmalltestdrivingfast,slowdrivingtestpointsettlemen

4、ttheamountisrelativelylarge,evenifthedrivingspeedto0(toolchangeduringsettlement),willcontinuetodevelop.②Thedeepsoilsettlementinshieldmachineheadthroughmeasuringpointsbeforeandafterthedevelopmentofabout15daysinsoilobviously,locatednearthesettlementoftunnelburieddepthof9~15mmaximu

5、m,withtheincreaseofdepth,thesettlementisgraduallyreduced.③Theearthpressurebymeasuringpointsbeforeandafter5~10daystofluctuateinshieldmachine,withmaximumdepthof9.5m~12.5mdepthsoilpressurechange.soilpressureatdifferentdepthsorupordown,or28.5%ofthelargest,thelargestdeclinein17.9%.(4

6、)ThisstudyanalyzestheimpactofthelossratioofthestratumofsoilIV万方数据上海交通大学硕士学位论文ABSTRACTdeformationandinternalforceofliningthroughnumericalsimulation,theinfluenceoffurtherresearchontheburieddepthofthetunnelandthegroutingonthepilefoundation,studyshows:①Influenceofstratumlossofsoilde

7、formationandinternalforceoftunnelisnonlinear;stratumlossrateisgreaterthan2%,therapiddevelopmentofsoildeformation;intheconstructionofdoubletracktunnel,shouldbereducedasmuchaspossibledoubledifferenceofstratumloss;atthesametimecontroleachofthetunnelgroundlossratioshouldnotbegreater

8、than1.4%.②Thepiletopsettlementdecreaseswiththei

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。