《挡土墙施工组织设计-重庆挡墙》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库。
1、b重庆85万吨/年甲醇装置挡土墙工程施工组织设计编制日期:二00九年二月bb目录一、编制说明········································二、编制依据及原则··································2.1编制依据·····································2.2编制原则·····································三、工程管理目标·····································四、工程概况······················
2、···················4.1工程地理位置bb·································4.2施工场地周围环境·····························4.3工程地质·····································4.4工程范围及规模·······························4.5工程主要特点·································五、设备、人员动员周期及材料组织供应··················5.1人员、设备动员周期············
3、················5.2技术准备······································5.3材料组织供应··································bb六、施工准备及临时设施·······························6.1临时房屋设施··································6.2水、电设施····································七、施工组织机构的建立·······························7.1组织机构设置····
4、·····························7.2施工组织管理机构的运作························八、施工计划··········································8.1工期进度计划·································bb8.1各施工队伍人员构成···························8.2施工设备计划·································8.3材料供应计划及措施···························九、施工方法·····
5、·····································9.1挡土墙构造····································9.2填土施工要求··································9.3锚杆挡土墙施工································9.4施工工艺流程··································bb9.5扶壁式挡土墙施工······························9.6衡重式挡土墙施工···························
6、···十、工程质量保证措施···································10.1技术保证措施·································10.2质量管理措施·································10.3施工组织措施·································十一、安全保证措施:····································bb11.1安全施工主要措施·····························11.2安全保证体系··············
7、···················十二、文明施工,加强环保······························12.1文明施工·····································12.2施工现场环境保护····························12.3绿化工作措施·································十三、施工进度保证措施:································13.1一般保证措施·················