1、*河**水电站工程建设项目可行性研究报告37目录3.1前言···········································3.2区域地质概况····································3.2.1地层岩性······································3.2.2地质构造······································3.2.3区域稳定性及地震·······························3

2、.3水库区工程地质条件·······························3.3.1基本工程地质条件·······························3.3.2主要工程地质问题及评价·························3.4坝址区工程地质条件·······························3.4.1基本工程地质条件·······························3.4.2岩(土)体物理力学特性··························

3、··3.4.3主要工程地质问题及评价··························3.4.4坝址比较及选择意见······························3.5推荐坝址主要建筑物工程地质条件·····················3.5.1主坝坝基工程地质条件······························3.5.2副坝坝基工程地质条件······························3.5.3发电引水渠工程地质条件·······················

4、·3.5.4厂房区工程地质条件······························3.5.5前池工程地质条件································3.5.6泄洪闸工程地质条件··························3.6比较坝址主要建筑物工程地质条件·····················3.6.1主坝坝基工程地质条件·····························3.6.2副坝坝基工程地质条件····························

5、··3.6.3厂房区工程地质条件·······························3.6.4泄洪闸工程地质条件·······························3.7天然建筑材料·······································3.7.1概况·············································3.7.2砼骨料········································3.7.3坝壳料········

6、··································3.7.4防渗土料········································3.8结论及今后工作建议·································373.1前言**水电站位于青海省**县和甘肃省***县交界的黄河干流上,是黄河上游龙(羊峡)—刘(家峡)河段规划的第七座中型电站,拟选坝址(上坝址、下坝址)位于**黄河大桥上游,距积石峡坝址6.3Km。坝址区以黄河为界,左岸属青海省**县官亭镇,距**县

7、城92Km;右岸属甘肃省***县**镇,距***县城29Km。对外有青海省川官(**-官亭)公路,交通方便。该电站以发电为主。设计正常蓄水位1783m,与积石峡水电站尾水衔接,坝顶高程1785m,最大坝高上坝址15m、下坝址46m,装机容量上坝址(引水方案)220MW、下坝址(河床式厂房)140MW,总库容上坝址约367万m3、下坝址约560万m3,工程属中型三等工程,主坝坝型为砂砾石堆石坝,副坝坝型为均质土坝。枢纽主要建筑物为三级,由拦河大坝、发电引水渠(上坝址)、厂房、泄水闸、开关站等建筑物组成,199

8、0年4月底对该枢纽进行了规划选点踏勘工作,1991年5月底陆续开始地勘工作,同年11月提交《黄河龙羊峡—刘家峡河段中型电站规划阶段**水电站工程地质报告》。2001年4月中旬,我院中标**水电站预可行性研究阶段的勘测设计工作,5月中旬专业人员进行现场踏勘,拟选上、下两个坝址进行预可行性研究阶段的工作,于10月底完成本阶段的全部勘测工作。2002年2月规划院专家组对预可研报告初稿进行了咨询,并提出咨询意见。主要勘测

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。