竹壁堰水库除险加固设计初设报告

竹壁堰水库除险加固设计初设报告

ID:28996730

大小:806.04 KB

页数:97页

时间:2018-12-15

竹壁堰水库除险加固设计初设报告_第1页
竹壁堰水库除险加固设计初设报告_第2页
竹壁堰水库除险加固设计初设报告_第3页
竹壁堰水库除险加固设计初设报告_第4页
竹壁堰水库除险加固设计初设报告_第5页
资源描述:

《竹壁堰水库除险加固设计初设报告》由会员上传分享,免费在线阅读,更多相关内容在应用文档-天天文库

1、竹壁堰水库工程特性表序号指标名称单位原设计加固前加固后备注一水文     1控制集雨面积km20.30.30.3 2干流长度km0.850.850.85 3干流平均坡降‰62.162.162.1 二水库     1水库水位     1)校核洪水位m89.1089.1088.98P=0.33%2)设计洪水位m88.8088.8088.75P=3.33%3)正常蓄水位m88.4088.488.4 4)死水位m80.580.580.5 2库容     1)总库容104m352.252.252.2 2)兴利库容104m343.843.843.

2、8 3)正常库容104m344.244.244.2 4)死库容104m30.40.40.4 三洪水     1)设计洪峰流量m3/s3.323.323.32 2)设计下泄流量m3/s0.370.370.37 3)校核洪峰流量m3/s4.784.784.78 4)校核下泄流量m3/s0.650.650.65 四坝     1)型式 均质土坝均质土坝均质土坝坝 2)坝顶高程m90.1390.1390.50 3)最大坝高m121212.37 4)坝顶宽m555 5)坝顶轴线长m878787 五泄水建筑物     1溢洪道     1)堰顶高

3、程m88.4088.4088.40 2)型式 宽顶堰宽顶堰宽顶堰 3)溢流堰宽度m1.21.21.2 instrumenthasasingletestcondition,willbetransferredtothecoordinationofthetestphase,theinstrumentaccordingtothestand-alonetrialsscheduled,withtheprocesspreparationoftestsolutions,equippedwithprofessionaltechniciansandski

4、lledworkers,toensuresafetyandquality.6.weldingengineeringconstructionprogramme6.1thisengineeringusedconstructionspecification6.1.1siteequipment,andindustrialpipelineweldingengineeringconstructionandtheacceptancespecificationGB50268-976.1.2oilchemicaltoxic,andcanburningm

5、ediapipelineengineeringconstructionandtheacceptancespecificationSH3501-20026.1.3oilchemicallowtemperaturesteelweldingproceduresSH/T3520-20046.1.4oilchemicalchromenickelAustrian'sbodysteel,andironnickelalloyandnickelalloypipelineweldingproceduresSH/T3523-19996.1.5SHJ520-

6、92petrochemicalengineeringtechnicalspecificationforweldingofCR-MOheat-resistantsteelpipe6.1.6ofthepressurevesselNDT4730-946.2JBweldpreparation6.2.1constructionaccordingtothematerialsoftheprojectspecificationsandweldingmethods,providingqualifiedweldingprocedurequalificat

7、ionreport.6.2.2qualifiedweldingprocedurequalificationbasedonthepreparationofweldinginstruction,guidethewelderweldingoperations.6.2.3whereparticipationinsitewelding,mustbeinpossessionofboilerandpressurevesselweldercertificatesissuedbytheLaborDepartment.6.2.4whereinvolved

8、inthepipeandsteelstructureweldingwelders,welderbeforeentryexaminationsshouldattendtheowners,andconstructionsho

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。