土木工程毕业设计手算书

土木工程毕业设计手算书

ID:28875664

大小:5.16 MB

页数:110页

时间:2018-12-14

土木工程毕业设计手算书_第1页
土木工程毕业设计手算书_第2页
土木工程毕业设计手算书_第3页
土木工程毕业设计手算书_第4页
土木工程毕业设计手算书_第5页
资源描述:

《土木工程毕业设计手算书》由会员上传分享,免费在线阅读,更多相关内容在学术论文-天天文库

1、某临街框架商住楼结构设计109目录第一节结构布置及计算简图............................2第二节荷载统计.......................................8第三节迭代法计算竖向荷载作用下的结构内力...........20第四节水平荷载计算..................................351.水平风荷载的内力计算..........................352.地震荷载的计算................................43第四节内力计算...

2、...................................57第六节构件截面设计.................................741、框架梁截面设计.................................742、框架柱截面设计.................................81第七节基础设计..................................100附:设计心得.......................................105致谢.............

3、................................107结构设计dslopetofacilitateemptying.(1)duringtheexcavationprocess,feelfreetocheckthestatusofsideslope,verticaldigdepthisgreaterthan1.5M,accordingtothechangesofsoil,excavation(Groove)ortrenchsupportpreparation,topreventcollapse.(2)excavation(Groov

4、e)andwhenthetrenchshouldnotdigtothedesignheightofthefollowing,ifnotexactlydiggingbaseelevationistodesign,persistenceofelevationabovealayerofsoilisnotdug,tocopyafterpingdugoutbyhand.(3)mechanicalconstructiondigintotheEarth,diggingmanualatanytime,andtrolleystotransportEarthmach

5、inerytodigtheplace,soastousethemachineryofcherry-picking.5,trimming...(1)soilexcavationonarainyday,theirworkshouldnotbetoolarge,shouldbedonepiecemeal,bystaging.(2)therainatthetimeofconstructionintheexcavationandearth-movingrequiredgreatattentiontoslopestability.Ifnecessary,th

6、eappropriateslowslope,orbraces,whileinthepits(Groove)outsidesurroundedbyEarthenbermsordiggingditches,preventsurfacewaterfromentering.Alwayscheckontheslope,support,anembankment,identifyproblemsanddealwith.II,backfillEngineering(a)constructionpreparationresearchfieldsiteformati

7、on,earthfillconstructionplan,determinethefillline,order,range,slope,drainagelevels,andsoon.1,theengineeringaccordingtothecharacteristicsofspecies,densityofthefillquantityrequirements,constructionsiteconditionsofreasonablefillsoilmoisturecontrol,virtualshopandcompactionparamet

8、ers,suchasnumber.2,undergroundandabove-groundpipelinesshouldbefoundo

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。