欢迎来到天天文库
浏览记录
ID:28875082
大小:3.63 MB
页数:113页
时间:2018-12-14
《土木工程交通工程毕业设计(论文)-洮儿河主河道桥施工图设计(上部结构)(全套cad图纸)》由会员上传分享,免费在线阅读,更多相关内容在学术论文-天天文库。
1、毕业设计说明书设计题目:洮儿河主河道桥施工图设计学生姓名:学号:专业班级:08交通2班学部:土木工程部指导教师:2012年05月21日洮儿河主河道桥施工图设计摘要长白线一级公路,洮儿河主河道中桥初步设计为3×30m的预应力混凝土简支T形梁桥。该桥采用并列双幅布置,左、右幅桥等长。上部为装配式全预应力钢筋混凝土简支T梁。预制T梁高2.1m,主梁间距2.0m。为降低主梁高度,减少预应力引起的上拱度,后张法预应力混凝土T梁在设计荷载下按全预应力混凝土构件设计,主梁配筋采用预应力筋和非预应力筋混合配筋。锚具采用OVM15—6型锚具,锚具变形钢筋回缩按3㎜计。预制件在张拉钢绞线时混凝土的强度应达到
2、85%以上方可张拉。下部桥墩为钢筋混凝土圆形双柱式墩,墩柱直径1.0m;桥墩基础为钻孔灌注桩基础,桩径1.2m。桥墩盖梁为连续墩盖梁,按简支梁计算盖梁内力及墩柱顶竖向反力。桩基为单排桩形式,采用正循环泥浆护壁成孔。全套完整版CAD图纸+开题报告+翻译+说明书,联系527953900关键词:T梁,预应力,后张法,锚固,钻孔灌注桩III土木工程部洮儿河主河道桥施工图设计AbstractChangbailinelevelofroads,inTao'erRivermainchannelbridgepreliminarydesignfor3×30mprestressedconcretesimple
3、supportTshapebeambridge.Thisbridgeusesthecompounddoubleamplitudearrangement,theleftandrightbridgeandsoonislong.UpsideforassemblytypeentireprestressedrinforcementconcretesimplesupportTroofbeam.PrefabricatedTroofbeamhigh2.1m,kingpostspacing2.0m.Inordertoreducethekingpostaltitude,reducesthecamberwhi
4、chthepre-stressedcauses,tensioningprestressedconcreteTroofbeamunderthedesignloadaccordingtotheentireprestressedconcretecomponentdesign,thekingpostmatchesthemuscletousethepre-stressedmuscleandthenon-pre-stressedmusclemixesthesyngamymuscle.TheanchorageusestheOVM15-6anchorage,theanchoragedeformedbar
5、'deformedreinforcbarretractionaccordingto3㎜theidea.Pre-workpiecewhenZhangLagangstrandedwiretheconcreteintensityshouldachieveabove85%onlythenopenspulls.Lowerpartthebridgepieristhereinforcedconcretecirculardistyledistylepillar,footstalldiameter1.0m;Pierfootingfordrillholeirrigationpilefoundation,pi
6、lediameter1.2m.BridgepierGeLiangforcontinualpillarGeLiang,calculatesGeaccordingtothesimplebeamtheLiangendogenicforceandthepillarmasttopverticalreaction.Pilefoundationuseforsinglepilingform,Thepilefoundationusesmudpropectswallofmaincirculationbecomestohole.Keywords:Chestbeam,Prestress,Posttenionin
7、gconcrete,Anchorage,DrilledIII土木工程部洮儿河主河道桥施工图设计目 录引言11设计总说明52设计计算书102.1上部结构102.1.1设计资料及构造布置102.1.2行车道板计算122.1.3主梁内力计算152.1.4主梁配筋计算322.1.5主梁截面几何特性计算362.1.6承载能力极限状态计算372.1.7预应力损失计算412.1.8正常使用极限状态计算462.1.9持久状况应力验算532.1.10
此文档下载收益归作者所有