1、现浇预应力混凝土连续箱梁桥的施工1.工程概况桐寨铺互通A匝道桥(AK0+605.496匝道桥)全长256m,上部采用4*20+(20+2*25+20)+4*20m跨径组合,其中第二联为三室等截面预应力混凝土箱形连续梁,第一、三联为三室等截面钢筋混凝土箱形连续梁,梁宽15.5m,梁高1.3m。2.支架施工2.1支架基础桥下地表平坦,承台基坑采用灰土分层夯实填筑后,在支架搭设范围内填筑不小于50㎝厚的灰土,然后浇筑10㎝厚的砼基础。2.2支架塔设上部箱梁施工采用(碗扣式)钢管支架作为支撑,承重部分由纵向和横向的工字钢组成,组合钢管支架采用工字钢联成

2、整体,横向设剪力撑,使其连成一体。根据支架实际的纵向和横向间距布设,考虑施工的恒载,活载计算支架的承载力,验算其稳定性。2.3支架预拱度设计与拱度计算公式为f=f1+f2+f3,其中f1:地基弹性变形,f2:支架弹性变形,f3:梁体挠度。f2=σL/E计算,f3根据施工经验取20m跨径为2cm,25m跨径为2.5cm。预拱度最大值设置在梁的跨中位置,并按抛物线形成进行分配,算得各点处的预拱度值后,通过支架上的砂筒对底模进行调整。25Cr-13Nitypeoraweldingmaterialwithhighnickelcontent.Lowtem

3、peraturesteels,austeniticstainlesssteelandheat-resistantcorrosion-resistanthighalloysteelsandausteniticandnon-austenitedissimilarsteelweldedjointsshallcomplywiththefollowingrequirements:toensurepenetrationandfusionundergoodconditions,lowcurrent,short-arc,weldingspeedandmuchf

4、asterweldingprocessandinterpasstemperatureshouldbecontrolled.Highcorrosionresistanceperformanceofdouble-sidedweldedwelds,weldedlayerincontactwithcorrosivemediafinallywelded.Lowtemperaturesteelwelding,suitableforthesurfaceoftheweldbeadannealing.Check6.6.16.6weldinginspectionb

5、eforeweldingmaterialandweldingmaterials,mustbecarriedoutaccordingtostandardacceptance,unqualifiedpersonsmaybeused.Groupbeforethedimensionsofvariouspartsofthemainstructure,Groovesizes,andgroovedsurfaceforinspection.WeldingGrooveandGrooveonbothsidesshouldbecheckedbeforetheclea

6、ningquality.Checktheweldingbeforeweldingconditionsareconsistentwiththeprescribedconditions,andweldingequipment.Thedryingandcleaningofweldingmaterialstoconfirmthatitmeetstherequirements.6.6.2intermediateweldinginspectiontackweldingaftertheskullshouldbeclearedcheckstoweldingth

7、edefectsfoundshallberemovedbeforetheycan.Multi-layerweldingweldingaftertheeachfloorshouldimmediatelycleanthelayers,andVisualinspection,founddefectsinweldedtoeliminatebeforetheycanproceedtothenextlevel.Tointerrupttheweldingseam,shouldbecleanedandcheckedbeforecontinuingtoweldt

8、oeliminateweldingdefectsfoundbytherear.6.6.3checkafterweldingseamsshallbewe

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。