金汇广场现场施工组织设计

金汇广场现场施工组织设计

ID:1475052

大小:409.00 KB

页数:100页

时间:2017-11-11

金汇广场现场施工组织设计_第1页
金汇广场现场施工组织设计_第2页
金汇广场现场施工组织设计_第3页
金汇广场现场施工组织设计_第4页
金汇广场现场施工组织设计_第5页
资源描述:

《金汇广场现场施工组织设计》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库

1、目录第一篇工程施工目标····························51.质量目标······································52.进度目标······································53.安全文明施工目标······························5第二篇工程概况································61.工程性质·····································62.工程地理位置及周围环境·········

2、··············6南汇县建筑总公司编制第100页3.建筑工程简况·································6第三篇施工准备································71.现场平面布置·································7-132.施工人员准备·································7-133.施工机械准备·································7-134.施工物资准备······················

3、···········7-135.施工技术准备·································7-13第四篇主要施工技术措施························14南汇县建筑总公司编制第100页1.施工部署·····································14-562.施工流程·····································14-563.施工测量定位及轴线标高控制方法及技术措施·····14-564.打桩施工工艺要点···························

4、··14-565.基础施工技术措施·····························14-566.上部结构工程施工技术措施·····················14-567.安装工程施工技术措施·························14-568.沉降观测计划·································14-56南汇县建筑总公司编制第100页9.季节性施工技术措施···························14-56第五篇特殊工程或工序施工技术方案··············571外墙防渗漏措施

5、····························57-601.1外墙砌筑措施······························57-601.2外墙粉刷措施·······························57-601.3结构增强措施·······························57-602厕所间、穿楼板管道防渗漏措施·················57-602.1结构施工防渗漏措施·························57-60南汇县建筑总公司编制第100页2.2预留洞的补筑及防水措施··

6、···················57-603屋面防渗漏措施·······························57-603.1结构施工防渗漏措施·························57-603.2穿屋面的管道及出气孔的补筑·················57-603.3防水层的施工·······························57-60第六篇项目施工主承包管理组织机构和技术力量配备·611.项目承包技术力量配备原则····················61-652.管理人员配备的情况········

7、··················61-653.现场管理体制和管理人员配置计划··············61-65南汇县建筑总公司编制第100页4.项目施工技术工人配备情况····················61-65第七篇施工进度计划···························661.确保总进度计划实施的措施····················66-712.劳动力配置计划······························66-713.施工工程进度计划····························66-71

8、第八篇质量、安全及文明施工保证措施···········711.质量保证措施及质量保证体系················

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。