《变配电室施工方案》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库。
1、目录一、编制依据–––––––––––––––––––––––––––––––-31.1主要依据施工图纸–––––––––––––––––––––––––––-31.2主要规程、规范、标准–––––––––––––––––––––––––-3二、工程概况–––––––––––––––––––––––––––––––3三、施工安排–––––––––––––––––––––––––––––––43.1施工部位及顺序––––––––––––––––––––––––––––-43.2劳动力及机具安––––
2、––––––––––––––––––––––––-4四、土方开挖–––––––––––––––––––––––––––––––64.1土方开挖––––––––––––––––––––––––––––––––64..2施工工艺––––––––––––––––––––––––––––––––64.3季节性施工–––––––––––––––––––––––––––––––74.4.开挖注意事项––––––––––––––––––––––––––––––74.5土方回填––––––––––––––––––
3、––––––––––––––7五、钢筋工程–––––––––––––––––––––––––––––––-75.1、钢筋分项工程概述–––––––––––––––––––––––––––-75.2、钢筋搭接长度、锚固长度应符合下列规定-––––––––––––––––-75.3、材料准备–––––––––––––––––––––––––––––––75.4、主要施工方法及措施-–––––––––––––––––––––––––-75.5、技术质量要求––––––––––––––––––––––––
4、–––––105.6、质量管理与措施––––––––––––––––––––––––––––115.7、成品保护–––––––––––––––––––––––––––––––11六、模板安装–––––––––––––––––––––––––––––––126.1施工工序–––––––––––––––––––––––––––––––--126.2材料准备–––––––––––––––––––––––––––––––-126.3制作与加工––––––––––––––––––––––––––––––-1
5、3七、混凝土浇注––––––––––––––––––––––––––––––147.1、混凝土供应方式–––––––––––––––––––––––––––––––––––--147.2、劳动组织––––––––––––––––––––––––––––––––––––––-157.3、施工准备–––––––––––––––––––––––––––––––––––––––157.4、主要施工方法及措施–––––––––––––––––––––––––––––––––-157.5、季节性施工–––––
6、––––––––––––––––––––––––––––––––-187.6、质量要求––––––––––––––––––––––––––––––––––––––-19487.7、成品保护措施–––––––––––––––––––––––––––––19八、脚手架构造要求及技术措施–––––––––––––––––––––––208.1扣件式钢管脚手架的构造要求及技术要求措施–––––––––––––––-20九、安全施工措施–––––––––––––––––––––––––––––229.1安全
7、生产基本措施–––––––––––––––––––––––––––––––––––229.2钢筋安全施工措施–––––––––––––––––––––––––––––––––––-229.3支模安全技术措施–––––––––––––––––––––––––––––––––––239.4混凝土施工安全注意事项––––––––––––––––––––––––––––––––259.5施工用电–––––––––––––––––––––––––––––––––––––––269.6、中小型机具操作安全措施
8、––––––––––––––––––––––––269.7、电、气焊––––––––––––––––––––––––––––––––––––––299.8、卡车––––––––––––––––––––––––––––––––––––––––299.9、水泵––––––––––––––––––––––––––––––––––––––––299.10、吊车––––––––––––––––––––––––––––––––––––––––29十、紧急情况和对应措施–––––––––––––