交通设施安装施工方案

交通设施安装施工方案

ID:13182809

大小:1.15 MB

页数:21页

时间:2018-07-21

交通设施安装施工方案_第1页
交通设施安装施工方案_第2页
交通设施安装施工方案_第3页
交通设施安装施工方案_第4页
交通设施安装施工方案_第5页
资源描述:

《交通设施安装施工方案》由会员上传分享,免费在线阅读,更多相关内容在教育资源-天天文库

1、施工方案批准人:审核人:编制人:甘肃鑫盛电子科技有限公司二0一一年五月二日ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortem

2、peratureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.Instrumentdiscca

3、binetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.

4、2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(

5、usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecorded

6、andthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic目录一、工程概况二、技术规范三、编制说明四、编制原则五、编制依据六、技术说明:(一)交通标识牌(二)交通标线(三)辅助标志:根据现场临时增设标志(四)标线七、施工方案:(一)交通标志牌施工(二)标线施工(三)橡胶减速带施工(四)橡胶车轮定位器施工(五)通道及诱导标牌施工(六)广角镜施工(七)护墙角施工八、施工部署九、施工质量措施十、安全保证体系及技术措施十一、文明施工措施ascorrosion,damp;information,instructions,d

7、rawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperating

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。