阿瓦提三期光伏并网发电项目施工组织设计

阿瓦提三期光伏并网发电项目施工组织设计

ID:13094385

大小:422.00 KB

页数:83页

时间:2018-07-20

阿瓦提三期光伏并网发电项目施工组织设计_第1页
阿瓦提三期光伏并网发电项目施工组织设计_第2页
阿瓦提三期光伏并网发电项目施工组织设计_第3页
阿瓦提三期光伏并网发电项目施工组织设计_第4页
阿瓦提三期光伏并网发电项目施工组织设计_第5页
资源描述:

《阿瓦提三期光伏并网发电项目施工组织设计》由会员上传分享,免费在线阅读,更多相关内容在教育资源-天天文库

1、阿瓦提三期光伏并网发电项目施工组织设计特变电工阿瓦提项目部2014年9月25日83目录第一章:项目概况和特点····················································51.1项目概况简述··························································51.2华电公司及新能源公司对项目的总体要求··································51.3总承包内容···············

2、·············································51.4项目整体方案··························································61.5项目工期目标··························································61.6项目涉及的主要单位····················································61.7施工现场

3、平面管理总则83··················································6第二章:项目管理组织机构及现场布置········································72.1项目管理组织机构······················································72.2管理机构组成原则······················································72.3项目

4、管理人员职责······················································82.4现场平面布置图························································10第三章:质量管理目标、质量保证体系及技术组织措施·························103.1质量目标、管理组织机构及职责··········································103.2质量控制程序····

5、······················································133.3全过程质量控制体系····················································143.4质量管理措施··························································163.583质量检验标准····················································

6、······183.6质量保证技术措施······················································193.7质量管理预防措施······················································203.8施工过程中的质量管理措施··············································213.9原材料质量管理·······································

7、·················21第四章:安全保证措施·····················································214.1安全管理目标··························································214.2安全管理组织机构······················································214.3安全管理负责人主要职责····················

8、····························224.4安全管理制度及办法·····················································244.5安全组织技术措施·······························83························25第五章:工程进度计划的实施及控制·······································

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。